排烟启动时间对烟气控制的影响 |
王婉娣, 张辉 |
清华大学 工程物理系, 公共安全研究院, 北京 100084 |
Influence of smoke exhaust start-up time on smoke control |
WANG Wandi, ZHANG Hui |
Institute for Public Safety Research, Department of Engineering Physics, Tsinghua University, Beijing 100084, China |
摘要:
| |||
摘要建筑火灾排烟系统设计中, 有关排烟启动时间至今仍没形成统一的设计方法或分析方法, 目前主要依靠专家经验或者依据排烟系统产品的性能进行取值和校验, 存在很大主观性。 该文通过综合考虑建筑火灾发展各阶段的经验模型, 给出了计算烟气层高度的递推求解式, 在此基础上利用灵敏度分析方法揭示了排烟启动时间对烟气控制效果的影响, 提出了启动时间取值的最优区间、风险区间和失效界点。 该研究有助于提高火灾排烟系统的设计合理性和安全性。 | |||
关键词 :建筑,火灾,排烟启动时间,灵敏度,烟气控制 | |||
Abstract:Fire smoke exhaust systems in buildings need accurate designs of the smoke exhaust start-up time. The start-up time is mainly determined by expert experience or the performance of constant exhaust systems, which are very subjective. This paper describes a recursive solution method to calculate the smoke layer height that integrates empirical models. A sensitivity analysis method is then used to study the influence of the smoke exhaust start-up time on the smoke control. Methods are given to calculate the best start-up time, the risk start-up time, and the critical invalidation start-up time. These findings can be used to improve smoke exhaust systems. | |||
Key words:buildingfiresmoke exhaust start-up timesensitivitysmoke control | |||
收稿日期: 2015-04-27 出版日期: 2016-02-17 | |||
| |||
基金资助:国家“九七三”重点基础研究发展计划(2012CB719705) | |||
通讯作者:张辉, 教授, E-mail: zhhui@tsinghua.edu.cnE-mail: zhhui@tsinghua.edu.cn | |||
作者简介: 王婉娣(1978—), 女(苗), 贵州, 博士研究生。 |
引用本文: |
王婉娣, 张辉. 排烟启动时间对烟气控制的影响[J]. 清华大学学报(自然科学版), 2016, 56(2): 223-228. WANG Wandi, ZHANG Hui. Influence of smoke exhaust start-up time on smoke control. Journal of Tsinghua University(Science and Technology), 2016, 56(2): 223-228. |
链接本文: |
http://jst.tsinghuajournals.com/CN/10.16511/j.cnki.qhdxxb.2015.22.023或 http://jst.tsinghuajournals.com/CN/Y2016/V56/I2/223 |
图表:
图1 灵敏度的3维云图 |
图2 不同twork下Stwork的时间历程曲线 |
图3 不同火灾时刻下Stwork与twork的关系曲线 |
图4 St2m-twork与twork的关系曲线 |
表1 排烟启动时间取值区间 |
参考文献:
[1] Toon M H, Maybauer M O, Greenwood J E, et al. Management of acute smoke inhalation injury [J]. Critical Care and Resuscitation: Journal of the Australasian Academy of Critical Care Medicine, 2010, 12(1): 53-61. [2] Crewe R J, Stec A A, Walker R G, et al. Experimental results of a residential house fire test on tenability: Temperature, smoke, and gas analyses [J]. Journal of Forensic Sciences, 2014, 59(1): 139-154. [3] Black A. Carbon Monoxide Detection in Residential Occupancies: Fire Protection Handbook [M]. Quincy, MA, USA: National Fire Protection Association, 2003. [4] 韩朱旸, 翁文国, 黄全义. 城市高层建筑火灾人员伤害实时定量评估 [J]. 清华大学学报: 自然科学版, 2012, 52(12): 1720-1725. HAN Zhuyang, WENG Wenguo, HUANG Quanyi. Real-time quantitative risk assessment of casualty for high-rise building fires [J]. J Tsinghua Univ: Sci & Tech, 2012, 52(12): 1720-1725. (in Chinese) [5] 郭增辉, 何其泽, 黎昌海. 商业建筑机械排烟系统启动时间的研究 [J]. 消防科学与技术, 2013, 32(6): 646-649. GUO Zenghui, HE Qize, LI Changhai. Study on the start time of mechanical exhaust system in economical building [J]. Fire Science and Technology, 2013, 32(6): 646-649. (in Chinese) [6] 吴爱臣, 付海明. 排烟系统开启时间对安全疏散影响的数值模拟[J]. 消防科学与技术, 2010, 29(11): 962-964. WU Aichen, FU Haiming. Numerical simulation about influences of the smoke control system start time to evacuation [J]. Fire Science and Technology, 2010, 29(11): 962-964. (in Chinese) [7] XU Junbin, ZHANG Cheng, ZHAO Junfei, et al. The study on influence factors of the mechanical smoke evacuation system in atrium buildings [J]. Procedia Engineering, 2013, 52: 508-513. [8] 赵泽文. 某商业综合体室内步行街消防设计数值模拟[J]. 消防科学与技术, 2012, 31(8): 816-820.ZHAO Zewen. Numerical simulation of fire protection design of a commercial complex [J]. Fire Science and Technology, 2012, 31(8): 816-820. (in Chinese) [9] 赵泽文, 徐海斌. 某悬挂式球幕影院消防设计数值模拟分析[J]. 消防科学与技术, 2011, 30(11): 1022-1025.ZHAO Zewen, XU Haibin. Numerical simulation and analysis of fire protection design of a hanging dome theater [J]. Fire Science and Technology, 2011, 30(11): 1022-1025. (in Chinese) [10] 郭子东, 岳海玲, 吴立志. 基于风险评价的重大火灾隐患判定方法[J]. 消防科学与技术, 2010, 29(4): 327-331. GUO Zidong, YUE Hailing, WU Lizhi. Major fire hazard judgment method based on risk assessment [J]. Fire Science and Technology, 2010, 29(4): 327-331. (in Chinese) [11] 程远平, 陈亮, 张孟君. 火灾过程中火源热释放速率模型及其实验测试方法 [J]. 火灾科学, 2002(2): 70-125.CHENG Yuanping, CHEN Liang, ZHANG Mengjun. The models and experimental testing method of heat release rate of fuel during the development of fire [J]. Fire Safety Science, 2002(2): 70-125. (in Chinese) [12] National Fire Protection Association. Guide for Smoke Management Systems in Malls, Atria and Large Areas [M]. Quincy, MA, USA: National Fire Protection Association, 2009. [13] 中华人民共和国公安部消防局. 中国消防手册[M]. 上海: 上海科学技术出版社, 2010.Fire Department of Ministry of Public Security of the People's Republic of China. China Fire Protection Handbook [M]. Shanghai: Shanghai Science and Technology Press, 2010. (in Chinese) [14] 李引擎. 建筑防火性能化设计 [M]. 北京: 化学工业出版社,2005. LI Yinqing. Performance-Based Building Fire Protection Design [M]. Beijing: Chemical Industry Press, 2005. (in Chinese) [15] Lougheed G D, Hadjisophocleous G V. Investigation of atrium smoke exhaust effectiveness [J]. ASHRAE Transactions, 1997, 103(2): 15-21. |
相关文章:
|