删除或更新信息,请邮件至freekaoyan#163.com(#换成@)

基于模糊层次分析法的建设项目组织效能评价模型

清华大学 辅仁网/2017-07-07

基于模糊层次分析法的建设项目组织效能评价模型
袁尚南, 强茂山, 温祺, 江汉臣
清华大学 水沙科学与水利水电工程国家重点实验室, 项目管理与建设技术研究所, 北京 100084
Organizational effectiveness evaluation model for construction projects based on fuzzy-analytic hierarchy processes
YUAN Shangnan, QIANG Maoshan, WEN Qi, JIANG Hanchen
Project Management and Technology Institute, State Key Laboratory of Hydroscience and Engineering, Tsinghua University, Beijing 100084, China

摘要:

输出: BibTeX | EndNote (RIS)
摘要建设项目的有效管理和改进需要对其组织效能的科学评价方法。该文基于建设项目组织要素的相互作用机理, 将建设项目组织效能的表征要素分为组织目标、内部流程、资源能力、组织人员和外部利益相关者这5个方面构建组织效能评价模型。通过模糊层次分析法计算指标权重并采用等级化数据给出指标评价值, 用综合评价值全面衡量建设项目组织效能, 应用此模型对某大型水电工程的8个子项目的组织效能进行评价。研究结果表明: 1) 项目组织效能各内涵要素的权重大小相近, 但其中组织人员要素处于核心地位; 2) 综合评价模型能够给出各个单要素分析结果, 有助于针对性地改进管理、提升项目组织效能; 3) 综合评价值与直接评价值高度显著相关, 且与定性访谈的结论相一致, 验证了模型的有效性。
关键词 组织效能,建设项目,模糊层次分析法
Abstract:Effective management of construction projects needs scientific methods to evaluate the organizational effectiveness. The interaction mechanism among organization elements of a construction project is used to evaluate the organizational effectiveness of construction projects (OECP). The effectiveness is divided into the organization goals, internal processes, resources and capabilities, organizational people and external stakeholders. Indicator weights are calculated by a fuzzy-analytic hierarchy process (F-AHP) while the indicators used by the hierarchical data and the OECP are evaluated by a synthesized evaluation value. This model is used to evaluate the organizational effectiveness of 8 sub-projects of a large hydropower project. The results show that: 1) the OECP factor weights are similar, with the organization staff being most important, 2) the model is able to analyze the results of a concern factor leading to targeted improvement of the management to improve the OECP, and 3) the synthetic evaluation has a high, significant correlation with the direct evaluation value. The quantitative ordering and qualitative interviews are consistent, which verifies the model's validity.
Key wordsorganizational effectivenessconstruction projectfuzzy-analytical hierarchy process
收稿日期: 2015-01-23 出版日期: 2015-09-08
ZTFLH:C93
F407.9
通讯作者:强茂山, 教授, E-mail: qiangms@mail.tsinghua.edu.cnE-mail: qiangms@mail.tsinghua.edu.cn
引用本文:
袁尚南, 强茂山, 温祺, 江汉臣. 基于模糊层次分析法的建设项目组织效能评价模型[J]. 清华大学学报(自然科学版), 2015, 55(6): 616-623.
YUAN Shangnan, QIANG Maoshan, WEN Qi, JIANG Hanchen. Organizational effectiveness evaluation model for construction projects based on fuzzy-analytic hierarchy processes. Journal of Tsinghua University(Science and Technology), 2015, 55(6): 616-623.
链接本文:
http://jst.tsinghuajournals.com/CN/ http://jst.tsinghuajournals.com/CN/Y2015/V55/I6/616


图表:
图1 建设项目组织要素的相互作用机理
表1 组织效能(OE)评价模型及其指标
表2 评价指标的度量方法
表3 标度的具体含义
表4 OE-B模糊判断矩阵和指标权重
表5 B1-C模糊判断矩阵和指标权重
表6 B2-C模糊判断矩阵和指标权重
表7 B3-C模糊判断矩阵和指标权重
表8 B4-C模糊判断矩阵和指标权重
表9 B5-C模糊判断矩阵和指标权重
表10 C2-D 模糊判断矩阵和指标权重
表11 C3-D 模糊判断矩阵和指标权重
表12 评价模型的指标权重
表13 项目1的模糊评价矩阵X
表14 各项目组织效能综合评价值和直接评价值
表15 综合评价值和直接评价值的相关分析


参考文献:
[1] March J G, Sutton R I. Crossroads-organizational performance as a dependent variable [J]. Organization Science, 1997, 8(6): 698-706.
[2] Dikmen I, Birgonul M T, Kiziltas S. Prediction of organizational effectiveness in construction companies [J]. Journal of Construction Engineering and Management, 2005, 131(2): 252-261.
[3] Drucker P F. The Effective Executive [M]. London, UK: Heinemann, 1967.
[4] Robbins S P, Decenzo D A. Fundamentals of Management: Essential Concepts and Applications [M]. Upper Saddle River, USA: Prentice Hall, 2005.
[5] Steers R M. Organizational Effectiveness: A Behavioral View [M]. Santa Monica, USA: Goodyear Publishing Company, 1977.
[6] Gaertner G H, Ramnarayan S. Organizational effectiveness: An alternative perspective [J]. Academy of Management Review, 1983, 8(1): 97-107.
[7] Hall R H. Organizations: Structures, Processes, and Outcomes [M]. 5th Ed. Upper Saddle River, USA: Prentice Hall, 1991.
[8] Pickle H, Friedlander R. Seven Societal Criteria of Organizational Success [J]. Personnel Psychology, 1967, 20(2).
[9] Keeley M. Impartiality and Participant-Interest Theories of Organizational Effectiveness [J]. Administrative Science Quarterly, 1984, 29(1): 1-25.
[10] Campbell J P. On the nature of organizational effectiveness [C]//Goodman P S, Pennings J M, ed. New Perspectives on Organizational Effectiveness. San Francisco, USA: Jossey-Bass, 1977: 13-55.
[11] Cameron K S. Critical questions in assessing organizational effectiveness [J]. Organizational Dynamics, 1980, 9(2): 66-80.
[12] Quinn R E, Rohrbaugh J. A spatial model of effectiveness criteria: Towards a competing values approach to organizational analysis [J]. Management Science, 1983, 29(3): 363-377.
[13] Yacinthe N J. An Assessment of the Organizational Effectiveness of Faith-based and Secular Community Development Corporations in the Provision of Economic Development and Other Services [D]. Atlantic, USA: Florida Atlantic University, 2004.
[14] Glunk U, Wilderom C P M. Organizational effectiveness= corporate performance? Why and how two research traditions need to be merged [Z/OL]. (2014-03-10), https://pure.uvt.nl/portal/files/522964/715.pdf.
[15] Daft R L. Organizational Theory and Design [M]. 10th Ed. Mason, USA: South-Western Cengage Learning, 2010.
[16] Cameron K S. The effectiveness of ineffectiveness [J]. Research in Organizational Behavior, 1984, 6: 235-285.
[17] Chan A P C, Chan A P L. Key performance indicators for measuring construction success [J]. Benchmarking: An International Journal, 2004, 11(2): 203-221.
[18] Boynton A C, Zmud R W. An assessment of critical success factors [J]. Sloan Management Review, 1984, 25(4): 17-27.
[19] Alinaitwe H, Mwakali J A, Hansson B. Organizational effectiveness of Ugandan building firms as viewed by craftsmen [J]. Journal of Civil Engineering and Management, 2009, 15(3): 281-288.
[20] Baccarini D. The concept of project complexity-A review [J]. International Journal of Project Management, 1996, 14(4): 201-204.
[21] Lu Y, Luo L, Wang H, et al. Measurement model of project complexity for large-scale projects from task and organization perspective [J]. International Journal of Project Management, 2015, 33(3): 610-622.
[22] 曹萍. 业主方建设项目管理的核心职能研究 [D]. 上海: 同济大学, 2007.CAO Ping. The Core Responsibilities of Owner's Construction Project Management [D]. Shanghai: Tongji University, 2007. (in Chinese)
[23] Turner J R, Müller R. On the nature of the project as a temporary organization [J]. International Journal of Project Management, 2003, 21(1): 1-8.
[24] Lam E W, Chan A P, Chan D W. Determinants of successful design-build projects [J]. Journal of Construction Engineering and Management, 2008, 134(5): 333-341.
[25] Ngacho C, Das D. A performance evaluation framework of development projects: An empirical study of Constituency Development Fund (CDF) construction projects in Kenya [J]. International Journal of Project Management, 2014, 32(3): 492-507.
[26] Nassar N, AbouRizk S. Practical application for integrated performance measurement of construction projects [J]. Journal of Management in Engineering, 2014, 30(6).
[27] PMI. A Guide to the Project Management Body of Knowledge [M]. 5th Ed. Newtown Square, USA: Project Management Institute; 2012.
[28] Mihaiu D M, Opreana A, Cristescu M P. Efficiency, effectiveness and performance of the public sector [J]. Romanian Journal of Economic Forecasting, 2010, 4(1): 132-147.
[29] Cheung S O, Yiu T W, Lam M C. Interweaving trust and communication with project performance [J]. Journal of Construction Engineering and Management, 2013, 139(8): 941-950.
[30] Sun J, Zhang P. Owner organization design for mega industrial construction projects [J]. International Journal of Project Management, 2011, 29(7): 828-833.
[31] Nayak N V, Taylor J E. Offshore outsourcing in global design networks [J]. Journal of Management in Engineering, 2009, 25(4): 177-184.
[32] Currivan D B. The causal order of job satisfaction and organizational commitment in models of employee turnover [J]. Human Resource Management Review, 2000, 9(4): 495-524.
[33] Olander S, Landin A. A comparative study of factors affecting the external stakeholder management process [J]. Construction Management and Economics, 2008, 26(6): 553-561.
[34] Krn S. Analysing customer satisfaction and quality in construction-the case of public and private customers [J]. Nordic Journal of Surveying and Real Estate Research, 2004, 2: 67-80.
[35] 黄菊文, 李光明, 王华等. 层次分析法评价固体废弃物的资源化利用 [J]. 同济大学学报: 自然科学版, 2007, 35(8): 1090-1094.HUANG Juwen, LI Guangming, WANG Hua, et al. Analytic hierarchy process-based evaluation of recycling solid waste in Shanghai [J]. Journal of Tongji University: Natural Science, 2007, 35(8): 1090-1094. (in Chinese)
[36] Saaty T L. What is the Analytic Hierarchy Process? [M]. Berlin, Germany: Springer, 1988.
[37] 徐泽水. 模糊互补判断矩阵排序的一种算法 [J]. 系统工程学报, 2001, 16(4): 311-314.XU Zeshui. Algorithm for priority of fuzzy complementary judgement matrix [J]. Journal of Systems Engineering, 2001, 16(4): 311-314. (in Chinese)
[38] 姬东朝, 宋笔锋, 喻天翔. 基于模糊层次分析法的决策方法及其应用 [J]. 火力与指挥控制, 2007, 32(11): 38-41.JI Dongchao, SONG Bifeng, YU Tianxiang. The method of decision-making based on FAHP and its application [J]. Fire Control and Command Control, 2007, 32(11): 38-41. (in Chinese)
[39] 陈华友, 赵佳宝. 模糊判断矩阵的相容性研究 [J]. 运筹与管理, 2004, 13(1): 44-47.CHEN Huayou, ZHAO Jiabao. Research on compatibility of fuzzy judgement matrices [J]. Operations Research and Management Science, 2004, 13(1): 44-47. (in Chinese)
[40] 徐泽水. 模糊互补判断矩阵的相容性及一致性研究 [J]. 解放军理工大学学报: 自然科学版, 2002, 3(2): 94-96.XU Zeshui. Research on compatibility and consistency of fuzzy complementary judgement matrices [J]. Journal of PLA University of Science and Technology, 2002, 3(2): 94-96. (in Chinese)


相关文章:
[1]强茂山, 袁尚南, 温祺. 工程项目团队能力的测量与评价[J]. 清华大学学报(自然科学版), 2015, 55(6): 624-632.

相关话题/组织 指标 管理 科学 资源