删除或更新信息,请邮件至freekaoyan#163.com(#换成@)

清华大学学者发表论文列表_王凌

本站小编 清华大学/2017-06-29

1.An Estimation of Distribution Algorithm-Based Memetic Algorithm for the Distributed Assembly Permutation Flow-Shop Scheduling Problem

Wang, SY, Wang, L

IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS[2168-2216], Published 2016, Volume 46, Issue 1, Pages 139-149

收录情况: WOS

WOS核心合集引用:6 影响因子: 1.598 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

2.A pareto-based discrete harmony search algorithm for bi-objective reentrant hybrid flowshop scheduling problem

Shen, Jingnan, Wang, Ling, Deng, Jin, Zheng, Xiaolong

Advances in Intelligent Systems and Computing[2194-5357], Published 2016, Volume 382, Pages 435-445

找找相关文章 PlumX Metrics


-----------------------------------------------------------------

3.An improved harmony search algorithm for the distributed two machine flow-shop scheduling problem

Deng, Jin, Wang, Ling, Shen, Jingnan, Zheng, Xiaolong

Advances in Intelligent Systems and Computing[2194-5357], Published 2016, Volume 382, Pages 97-108

找找相关文章 PlumX Metrics


-----------------------------------------------------------------

4.A novel two-stage Lagrangian decomposition approach for refinery production scheduling with operational transitions in mode switching

Shi, L, Jiang, YH, Wang, L, Huang, DX

CHINESE JOURNAL OF CHEMICAL ENGINEERING[1004-9541], Published 2015, Volume 23, Issue 11, Pages 1793-1800

收录情况: WOS

WOS核心合集引用:1 影响因子: 1.207 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

5.Intelligent manufacturing: New advances and challenges

Hu, HS, Wang, L, Luh, P

JOURNAL OF INTELLIGENT MANUFACTURING[0956-5515], Published 2015, Volume 26, Issue 5, Pages 841-843

收录情况: WOS

影响因子: 1.995 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

6.A hybrid estimation of distribution algorithm for the semiconductor final testing scheduling problem

Wang, SY, Wang, L, Liu, M, Xu, Y

JOURNAL OF INTELLIGENT MANUFACTURING[0956-5515], Published 2015, Volume 26, Issue 5, Pages 861-871

收录情况: WOS SCOPUS

影响因子: 1.995 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

7.A multi-agent optimization algorithm for resource constrained project scheduling problem

Zheng, XL, Wang, L

EXPERT SYSTEMS WITH APPLICATIONS[0957-4174], Published 2015, Volume 42, Issue 15-16, Pages 6039-6049

收录情况: WOS SCOPUS

WOS核心合集引用:5 影响因子: 2.981 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

8.A knowledge-based multi-agent evolutionary algorithm for semiconductor final testing scheduling problem

Wang, SY, Wang, L

KNOWLEDGE-BASED SYSTEMS[0950-7051], Published 2015, Volume 84, Pages 1-9

收录情况: WOS

WOS核心合集引用:2 影响因子: 3.325 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

9.Reduction of carbon emissions and project makespan by a Pareto-based estimation of distribution algorithm

Zheng, HY, Wang, L

INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS[0925-5273], Published 2015, Volume 164, Pages 421-432

收录情况: WOS SCOPUS

WOS核心合集引用:5 影响因子: 2.782 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

10.An effective teaching-learning-based optimisation algorithm for RCPSP with ordinal interval numbers

Zheng, HY, Wang, L

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH[0020-7543], Published 2015, Volume 53, Issue 6, Pages 1777-1790

收录情况: WOS SCOPUS

WOS核心合集引用:8 影响因子: 1.693 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

11.An order-based estimation of distribution algorithm for stochastic hybrid flow-shop scheduling problem

Wang, SY, Wang, L, Liu, M, Xu, Y

INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING[0951-192X], Published 2015, Volume 28, Issue 3, Pages 307-320

收录情况: WOS SCOPUS

WOS核心合集引用:4 影响因子: 1.319 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

12.An effective teaching-learning-based optimization algorithm for the flexible job-shop scheduling problem with fuzzy processing time

Xu, Y, Wang, L, Wang, SY, Liu, M

NEUROCOMPUTING[0925-2312], Published 2015, Volume 148, Pages 260-268

收录情况: WOS SCOPUS

WOS核心合集引用:30 影响因子: 2.392 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

13.A bi-population EDA for solving the no-idle permutation flow-shop scheduling problem with the total tardiness criterion

Shen, JN, Wang, L, Wang, SY

KNOWLEDGE-BASED SYSTEMS[0950-7051], Published 2015, Volume 74, Pages 167-175

收录情况: WOS SCOPUS

WOS核心合集引用:6 影响因子: 3.325 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

14.Connection-graph-based event-triggered output consensus in multi-agent systems with time-varying couplings

Zhang, Xu, Chen, Maoyin, Wang, Ling, Pang, Zhonghua, Zhou, Donghua

IET Control Theory and Applications[1751-8644], Published 2015, Volume 9, Issue 1, Pages 1-9

收录情况: WOS SCOPUS

WOS核心合集引用:5 影响因子: 1.957 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

15.An estimation of distribution algorithm and new computational results for the stochastic resource-constrained project scheduling problem

Fang, Chen, Wang, Ling, Mu, Chundi, Kolisch, Rainer

Flexible Services and Manufacturing Journal[1936-6582], Published 2015,

收录情况: WOS SCOPUS

WOS核心合集引用:2 影响因子: 1.857 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

16.Advances in co-evolutionary algorithms

Wang, Ling, Shen, Jingnan, Wang, Shengyao, Deng, Jin

Kongzhi yu Juece/Control and Decision[1001-0920], Published 2015, Volume 30, Issue 2, Pages 193-202

收录情况: SCOPUS CNKI

找找相关文章 PlumX Metrics


-----------------------------------------------------------------

17.An iterated greedy algorithm for the hybrid flowshop problem with makespan criterion

Kizilay, Damla, Tasgetiren, Mehmet Fatih, Pan, Quanke, Wang, Ling

IEEE SSCI 2014 - 2014 IEEE Symposium Series on Computational Intelligence - CIPLS 2014: 2014 IEEE Symposium on Computational Intelligence in Production and Logistics Systems, Proceedings, Published 2015, Pages 16-23

收录情况: SCOPUS

找找相关文章 PlumX Metrics


-----------------------------------------------------------------

18.一种新颖的解决包含模式切换过渡过程的炼油厂生产调度问题的两阶段拉格朗日分解算法(英文)

施磊,江永亨,王凌,黄德先

Chinese Journal of Chemical Engineering[1004-9541], Published 2015, Issue 11, Pages 63-70

收录情况: CNKI

影响因子: 1.207 找找相关文章


-----------------------------------------------------------------

19.随机资源约束项目调度问题基于序的果蝇算法

郑晓龙,王凌

控制理论与应用[1000-8152], Published 2015, Issue 04, Pages 123-128

收录情况: CNKI

找找相关文章 PlumX Metrics


-----------------------------------------------------------------

20.存在执行器故障的多智能体系统的容错一致性

张旭,陈茂银,王凌,周东华

上海交通大学学报[1006-2467], Published 2015, Issue 06, Pages 72-77

收录情况: CNKI

找找相关文章


-----------------------------------------------------------------

21.一种多目标资源受限项目调度问题的教学算法

王凌,郑环宇

控制与决策[1001-0920], Published 2015, Issue 10, Pages 143-147

收录情况: CNKI

找找相关文章 PlumX Metrics


-----------------------------------------------------------------

22.求解分布式置换流水线调度问题的化学反应优化算法

沈婧楠,王凌,王圣尧

清华大学学报(自然科学版)[1000-0054], Published 2015, Issue 11, Pages 30-35+42

收录情况: CNKI

找找相关文章


-----------------------------------------------------------------

23.Teachinglearning-based optimization algorithm for multi-skill resource constrained project scheduling problem

Zheng, Huan-yu, Wang, Ling, Zheng, Xiao-long

Soft Computing[1432-7643], Published 2015,

影响因子: 1.63 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

24.A knowledge-based fruit fly optimization algorithm for multi-skill resource-constrained project scheduling problem

Zheng, Xiaolong, Wang, Ling, Zheng, Huanyu

Chinese Control Conference, CCC[1934-1768], Published 2015, Volume 2015-September, Pages 2615-2620

找找相关文章 PlumX Metrics


-----------------------------------------------------------------

25.A novel comprehensive solution for furnace integrating outlet parametric variable control and online thermal efficiency optimization

Qi, Lugang, Gao, Xiaoyong, Huang, Dexian, Wang, Ling, Wang, Haijun, Song, Shuguang

Chinese Control Conference, CCC[1934-1768], Published 2015, Volume 2015-September, Pages 4139-4144

找找相关文章 PlumX Metrics


-----------------------------------------------------------------

26.Intelligent Computing for Sustainable Energy and Environment (ICSEE 2012)

Li, Kang, McLoone, Seán, Wang, Ling

Neurocomputing[0925-2312], Published 2015, Volume 148, Pages 198-199

影响因子: 2.392 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

27.Chemical reaction optimization algorithm for the distributed permutation flowshop scheduling problem

Shen, Jingnan, Wang, Ling, Wang, Shengyao

Qinghua Daxue Xuebao/Journal of Tsinghua University[1000-0054], Published 2015, Volume 55, Issue 11, Pages 1184-1189 and 1196

找找相关文章 PlumX Metrics


-----------------------------------------------------------------

28.Fault-tolerant consensus for a network of multi-agent systems with actuator faults

Zhang, Xu, Chen, Mao-Yin, Wang, Ling, Zhou, Dong-Hua

Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University[1006-2467], Published 2015, Volume 49, Issue 6, Pages 806-811

找找相关文章 PlumX Metrics


-----------------------------------------------------------------

29.Distributed event-triggered consensus in multi-Agent systems with non-linear protocols

Zhang, Xu, Chen, Maoyin, Wang, Ling

IET Control Theory and Applications[1751-8644], Published 2015, Volume 9, Issue 18, Pages 2626-2633

收录情况: WOS

影响因子: 1.957 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

30.Shuffled frog-leaping algorithm based batch scheduling in semiconductor furnace

Xu, Ye, Wang, Ling, Wang, Sheng-Yao, Deng, Jin

Proceedings of the World Congress on Intelligent Control and Automation (WCICA), Published 2015, Volume 2015-March, Issue March, Pages 2717-2722

找找相关文章 PlumX Metrics


-----------------------------------------------------------------

31.Efficient Lagrangian Decomposition Approach for Solving Refinery Production Scheduling Problems Involving Operational Transitions of Mode Switching

Shi, Lei, Jiang, Yongheng, Wang, Ling, Huang, Dexian

Industrial and Engineering Chemistry Research[0888-5885], Published 2015, Volume 54, Issue 25, Pages 6508-6526

收录情况: WOS

WOS核心合集引用:2 影响因子: 2.567 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

32.An effective hybrid immune algorithm for solving the distributed permutation flow-shop scheduling problem

Xu, Y, Wang, L, Wang, SY, Liu, M

ENGINEERING OPTIMIZATION[0305-215X], Published 2014, Volume 46, Issue 9, Pages 1269-1283

收录情况: WOS SCOPUS

WOS核心合集引用:14 影响因子: 1.38 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

33.A novel discrete artificial bee colony algorithm for the hybrid flowshop scheduling problem with makespan minimisation

Pan, QK, Wang, L, Li, JQ, Duan, JH

OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE[0305-0483], Published 2014, Volume 45, Pages 42-56

收录情况: WOS SCOPUS

WOS核心合集引用:33 影响因子: 3.962 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

34.Solving system-level synthesis problem by a multi-objective estimation of distribution algorithm

Wang, L, Fang, C, Suganthan, PN, Liu, M

EXPERT SYSTEMS WITH APPLICATIONS[0957-4174], Published 2014, Volume 41, Issue 5, Pages 2496-2513

收录情况: WOS SCOPUS

WOS核心合集引用:6 影响因子: 2.981 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

35.A novel fruit fly optimization algorithm for the semiconductor final testing scheduling problem

Zheng, XL, Wang, L, Wang, SY

KNOWLEDGE-BASED SYSTEMS[0950-7051], Published 2014, Volume 57, Pages 95-103

收录情况: WOS SCOPUS

WOS核心合集引用:38 影响因子: 3.325 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

36.A Co-evolutionary Teaching-learning-based Optimization Algorithm for Stochastic RCPSP

Zheng, HY, Wang, L, Wang, SY

2014 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), Published 2014, Pages 587-594

收录情况: WOS SCOPUS

WOS核心合集引用:1 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

37.An Enhanced Non-dominated Sorting Based Fruit Fly Optimization Algorithm for Solving Environmental Economic Dispatch Problem

Zheng, XL, Wang, L, Wang, SY

2014 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), Published 2014, Pages 626-633

收录情况: WOS SCOPUS

WOS核心合集引用:1 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

38.A Grouped Fruit-Fly Optimization Algorithm for the No-Wait Lot Streaming Flow Shop Scheduling

Zhang, P, Wang, L

INTELLIGENT COMPUTING METHODOLOGIES[0302-9743], Published 2014, Volume 8589, Pages 664-674

收录情况: WOS SCOPUS

找找相关文章 PlumX Metrics


-----------------------------------------------------------------

39.An Effective Estimation of Distribution Algorithm for Multi-track Train Scheduling Problem

Wang, SY, Wang, L

INTELLIGENT COMPUTING METHODOLOGIES[0302-9743], Published 2014, Volume 8589, Pages 697-708

收录情况: WOS SCOPUS

找找相关文章 PlumX Metrics


-----------------------------------------------------------------

40.A Discrete Fruit Fly Optimization Algorithm for Flow Shop Scheduling Problem with Intermingling Equal Sublots

Zhang, P, Wang, L, Wang, SY

2014 33RD CHINESE CONTROL CONFERENCE (CCC)[1948-9439], Published 2014, Pages 7466-7471

收录情况: WOS SCOPUS

WOS核心合集引用:2 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

41.A hybrid discrete fruit fly optimization algorithm for solving permutation flow-shop scheduling problem

Zheng, Xiaolong, Wang, Ling, Wang, Shengyao

Kongzhi Lilun Yu Yingyong/Control Theory and Applications[1000-8152], Published 2014, Volume 31, Issue 2, Pages 159-164

收录情况: SCOPUS

找找相关文章 PlumX Metrics


-----------------------------------------------------------------

42.Survey on resource-constrained project scheduling under uncertainty

Wang, Ling, Zheng, Huanyu, Zheng, Xiaolong

Kongzhi yu Juece/Control and Decision[1001-0920], Published 2014, Volume 29, Issue 4, Pages 577-584

收录情况: SCOPUS

找找相关文章


-----------------------------------------------------------------

43.An improved fruit fly optimization algorithm for solving lot-streaming flow-shop scheduling problem

Zhang, Peng, Wang, Ling

IWACIII 2013 - 3rd International Workshop on Advanced Computational Intelligence and Intelligent Informatics, Published 2014,

收录情况: SCOPUS

找找相关文章


-----------------------------------------------------------------

44.求解置换流水线调度问题的混合离散果蝇算法

郑晓龙,王凌,王圣尧

控制理论与应用[1000-8152], Published 2014, Issue 02, Pages 34-39

收录情况: CNKI

找找相关文章


-----------------------------------------------------------------

45.不确定资源受限项目调度研究综述

王凌,郑环宇,郑晓龙

控制与决策[1001-0920], Published 2014, Issue 04, Pages 4-11

收录情况: CNKI

找找相关文章


-----------------------------------------------------------------

46.Compact estimation of distribution algorithm for semiconductor final testing scheduling problem

Wang, Shengyao, Wang, Ling

IEEE International Conference on Automation Science and Engineering[2161-8070], Published 2014, Volume 2014-January, Pages 113-118

找找相关文章 PlumX Metrics


-----------------------------------------------------------------

47.Improved fruit fly optimization algorithm for solving lot-streaming flow-shop scheduling problem

Zhang, Peng, Wang, Ling

Journal of Donghua University (English Edition)[1672-5220], Published 2014, Volume 31, Issue 2, Pages 165-170

找找相关文章


-----------------------------------------------------------------

48.Refinery production scheduling involving operational transitions of mode switching under predictive control system

Shi, Lei, Jiang, Yongheng, Wang, Ling, Huang, Dexian

Industrial and Engineering Chemistry Research[0888-5885], Published 2014, Volume 53, Issue 19, Pages 8155-8170

收录情况: WOS

WOS核心合集引用:9 影响因子: 2.567 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

49.A competitive memetic algorithm for the distributed flow shop scheduling problem

Deng, Jin, Wang, Ling, Wang, Shengyao

IEEE International Conference on Automation Science and Engineering[2161-8070], Published 2014, Volume 2014-January, Pages 107-112

找找相关文章 PlumX Metrics


-----------------------------------------------------------------

50.An effective shuffled frog-leaping algorithm for solving the hybrid flow-shop scheduling problem with identical parallel machines

Xu, Y, Wang, L, Wang, SY, Liu, M

ENGINEERING OPTIMIZATION[0305-215X], Published 2013, Volume 45, Issue 12, Pages 1409-1430

收录情况: WOS SCOPUS

WOS核心合集引用:6 影响因子: 1.38 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

51.An enhanced estimation of distribution algorithm for solving hybrid flow-shop scheduling problem with identical parallel machines

Wang, SY, Wang, L, Liu, M, Xu, Y

INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY[0268-3768], Published 2013, Volume 68, Issue 42625, Pages 2043-2056

收录情况: WOS SCOPUS

WOS核心合集引用:12 影响因子: 1.568 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

52.An effective shuffled frog-leaping algorithm for hybrid flow-shop scheduling with multiprocessor tasks

Xu, Y, Wang, L, Liu, M, Wang, SY

INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY[0268-3768], Published 2013, Volume 68, Issue 42498, Pages 1529-1537

收录情况: WOS SCOPUS

WOS核心合集引用:1 影响因子: 1.568 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

53.An effective estimation of distribution algorithm for solving the distributed permutation flow-shop scheduling problem

Wang, SY, Wang, L, Liu, M, Xu, Y

INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS[0925-5273], Published 2013, Volume 145, Issue 1, Pages 387-396

收录情况: WOS SCOPUS

WOS核心合集引用:37 影响因子: 2.782 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

54.A Pareto-Archived Estimation-of-Distribution Algorithm for Multiobjective Resource-Constrained Project Scheduling Problem

Wang, L, Fang, C, Mu, CD, Liu, M

IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT[0018-9391], Published 2013, Volume 60, Issue 3, Pages 617-626

收录情况: WOS SCOPUS

WOS核心合集引用:10 影响因子: 1.454 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

55.A novel binary fruit fly optimization algorithm for solving the multidimensional knapsack problem

Wang, L, Zheng, XL, Wang, SY

KNOWLEDGE-BASED SYSTEMS[0950-7051], Published 2013, Volume 48, Pages 17-23

收录情况: WOS SCOPUS

WOS核心合集引用:60 影响因子: 3.325 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

56.A High Performing Memetic Algorithm for the Flowshop Scheduling Problem With Blocking

Pan, QK, Wang, L, Sang, HY, Li, JQ, Liu, M

IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING[1545-5955], Published 2013, Volume 10, Issue 3, Pages 741-756

收录情况: WOS SCOPUS

WOS核心合集引用:14 影响因子: 2.696 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

57.An effective immune algorithm based on novel dispatching rules for the flexible flow-shop scheduling problem with multiprocessor tasks

Xu, Y, Wang, L, Wang, SY, Liu, M

INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY[0268-3768], Published 2013, Volume 67, Issue 42373, Pages 121-135

收录情况: WOS SCOPUS

WOS核心合集引用:3 影响因子: 1.568 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

58.A Pareto-based estimation of distribution algorithm for the multi-objective flexible job-shop scheduling problem

Wang, L, Wang, SY, Liu, M

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH[0020-7543], Published 2013, Volume 51, Issue 12, Pages 3574-3592

收录情况: WOS SCOPUS

WOS核心合集引用:26 影响因子: 1.693 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

59.A hybrid artificial bee colony algorithm for the fuzzy flexible job-shop scheduling problem

Wang, L, Zhou, G, Xu, Y, Liu, M

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH[0020-7543], Published 2013, Volume 51, Issue 12, Pages 3593-3608

收录情况: WOS SCOPUS

WOS核心合集引用:18 影响因子: 1.693 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

60.An effective estimation of distribution algorithm for the flexible job-shop scheduling problem with fuzzy processing time

Wang, SY, Wang, L, Xu, Y, Liu, M

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH[0020-7543], Published 2013, Volume 51, Issue 12, Pages 3778-3793

收录情况: WOS SCOPUS

WOS核心合集引用:26 影响因子: 1.693 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

61.An Effective Artificial Bee Colony Algorithm for a Real-World Hybrid Flowshop Problem in Steelmaking Process

Pan, QK, Wang, L, Mao, K, Zhao, JH, Zhang, M

IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING[1545-5955], Published 2013, Volume 10, Issue 2, Pages 307-322

收录情况: WOS SCOPUS

WOS核心合集引用:49 影响因子: 2.696 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

62.An Effective Shuffled Frog-leaping Algorithm for the Flexible Job-shop Scheduling Problem

Xu, Y, Wang, L, Wang, SY

PROCEEDINGS OF THE 2013 IEEE SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE IN CONTROL AND AUTOMATION (CICA)[2328-1464], Published 2013, Pages 128-134

收录情况: WOS SCOPUS

找找相关文章 PlumX Metrics


-----------------------------------------------------------------

63.An estimation of distribution algorithm for the multi-objective flexible job-shop scheduling problem

Wang, SY, Wang, L, Liu, M, Xu, Y

PROCEEDINGS OF THE 2013 IEEE SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE IN SCHEDULING (CISCHED), Published 2013, Pages 1-8

收录情况: WOS SCOPUS

WOS核心合集引用:7 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

64.An effective differential harmony search algorithm for the solving non-convex economic load dispatch problems

Wang, L, Li, LP

INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS[0142-0615], Published 2013, Volume 44, Issue 1, Pages 832-843

收录情况: WOS SCOPUS

WOS核心合集引用:45 影响因子: 2.587 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

65.Estimation of distribution algorithm for solving hybrid flow-shop scheduling problem with identical parallel machine

Wang, Shengyao, Wang, Ling, Xu, Ye

Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS[1006-5911], Published 2013, Volume 19, Issue 6, Pages 1304-1312

收录情况: SCOPUS

找找相关文章


-----------------------------------------------------------------

66.Ordinal chemical reaction optimization for stochastic resource constrained project scheduling problem

Zheng, Huanyu, Wang, Ling, Wang, Shengyao, Fang, Chen

Chinese Control Conference, CCC[1934-1768], Published 2013, Pages 2437-2442

收录情况: SCOPUS

找找相关文章


-----------------------------------------------------------------

67.An estimation of distribution algorithm for solving hybrid flow-shop scheduling problem with stochastic processing time

Wang, Shengyao, Wang, Ling, Xu, Ye

Chinese Control Conference, CCC[1934-1768], Published 2013, Pages 2456-2461

收录情况: SCOPUS

找找相关文章


-----------------------------------------------------------------

68.Emerging intelligent computing technology and applications

Huang, Deshuang, Gupta, Phalguni, Wang, Ling, Gromiha, Michael Michael Michael

Communications in Computer and Information Science[1865-0929], Published 2013, Volume 375,

收录情况: SCOPUS

找找相关文章 PlumX Metrics


-----------------------------------------------------------------

69.求解相同并行机混合流水线车间调度问题的分布估计算法

王圣尧,王凌,许烨

计算机集成制造系统[1006-5911], Published 2013, Issue 06, Pages 142-150

收录情况: CNKI

找找相关文章


-----------------------------------------------------------------

70.An enhanced Pareto-based artificial bee colony algorithm for the multi-objective flexible job-shop scheduling

Wang, L, Zhou, G, Xu, Y, Liu, M

INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY[0268-3768], Published 2012, Volume 60, Issue 42625, Pages 1111-1123

收录情况: WOS SCOPUS

WOS核心合集引用:28 影响因子: 1.568 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

71.A bi-population based estimation of distribution algorithm for the flexible job-shop scheduling problem

Wang, L, Wang, SY, Xu, Y, Zhou, G, Liu, M

COMPUTERS & INDUSTRIAL ENGINEERING[0360-8352], Published 2012, Volume 62, Issue 4, Pages 917-926

收录情况: WOS SCOPUS

WOS核心合集引用:44 影响因子: 2.086 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

72.An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem

Fang, C, Wang, L

COMPUTERS & OPERATIONS RESEARCH[0305-0548], Published 2012, Volume 39, Issue 5, Pages 890-901

收录情况: WOS SCOPUS

WOS核心合集引用:54 影响因子: 1.988 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

73.An effective artificial bee colony algorithm for the flexible job-shop scheduling problem

Wang, L, Zhou, G, Xu, Y, Wang, S, Liu, M

INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY[0268-3768], Published 2012, Volume 60, Issue 42373, Pages 303-315

收录情况: WOS SCOPUS

WOS核心合集引用:47 影响因子: 1.568 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

74.A novel decoding method for the hybrid flow-shop scheduling problem with multiprocessor tasks

Wang, L, Xu, Y, Zhou, G, Wang, SY, Liu, M

INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY[0268-3768], Published 2012, Volume 59, Issue 42625, Pages 1113-1125

收录情况: WOS SCOPUS

WOS核心合集引用:6 影响因子: 1.568 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

75.A coevolutionary differential evolution with harmony search for reliability-redundancy optimization

Wang, L, Li, LP

EXPERT SYSTEMS WITH APPLICATIONS[0957-4174], Published 2012, Volume 39, Issue 5, Pages 5271-5278

收录情况: WOS SCOPUS

WOS核心合集引用:22 影响因子: 2.981 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

76.An effective hybrid EDA-based algorithm for solving multidimensional knapsack problem

Wang, L, Wang, SY, Xu, Y

EXPERT SYSTEMS WITH APPLICATIONS[0957-4174], Published 2012, Volume 39, Issue 5, Pages 5593-5599

收录情况: WOS SCOPUS

WOS核心合集引用:33 影响因子: 2.981 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

77.An effective hybrid genetic algorithm with flexible allowance technique for constrained engineering design optimization

Zhao, JQ, Wang, L, Zeng, P, Fan, WH

EXPERT SYSTEMS WITH APPLICATIONS[0957-4174], Published 2012, Volume 39, Issue 5, Pages 6041-6051

收录情况: WOS SCOPUS

WOS核心合集引用:15 影响因子: 2.981 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

78.Effective heuristics for the blocking flowshop scheduling problem with makespan minimization

Pan, QK, Wang, L

OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE[0305-0483], Published 2012, Volume 40, Issue 2, Pages 218-229

收录情况: WOS SCOPUS

WOS核心合集引用:30 影响因子: 3.962 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

79.A hybrid estimation of distribution algorithm for solving the resource-constrained project scheduling problem

Wang, L, Fang, C

EXPERT SYSTEMS WITH APPLICATIONS[0957-4174], Published 2012, Volume 39, Issue 3, Pages 2451-2460

收录情况: WOS SCOPUS

WOS核心合集引用:18 影响因子: 2.981 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

80.A novel group search optimizer for multi-objective optimization

Wang, L, Zhong, X, Liu, M

EXPERT SYSTEMS WITH APPLICATIONS[0957-4174], Published 2012, Volume 39, Issue 3, Pages 2939-2946

收录情况: WOS SCOPUS

WOS核心合集引用:10 影响因子: 2.981 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

81.An effective estimation of distribution algorithm for the multi-mode resource-constrained project scheduling problem

Wang, L, Fang, C

COMPUTERS & OPERATIONS RESEARCH[0305-0548], Published 2012, Volume 39, Issue 2, Pages 449-460

收录情况: WOS SCOPUS

WOS核心合集引用:51 影响因子: 1.988 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

82.An Effective Artificial Bee Colony Algorithm for Multi-objective Flexible Job-Shop Scheduling Problem

Zhou, G, Wang, L, Xu, Y, Wang, SY

ADVANCED INTELLIGENT COMPUTING THEORIES AND APPLICATIONS: WITH ASPECTS OF ARTIFICIAL INTELLIGENCE[0302-9743], Published 2012, Volume 6839, Pages 1-8

收录情况: WOS

WOS核心合集引用:6 找找相关文章


-----------------------------------------------------------------

83.An Estimation of Distribution Algorithm for the Flexible Job-Shop Scheduling Problem

Wang, SY, Wang, L, Zhou, G, Xu, Y

ADVANCED INTELLIGENT COMPUTING THEORIES AND APPLICATIONS: WITH ASPECTS OF ARTIFICIAL INTELLIGENCE[0302-9743], Published 2012, Volume 6839, Pages 9-16

收录情况: WOS

WOS核心合集引用:4 找找相关文章


-----------------------------------------------------------------

84.A DE Based Variable Iterated Greedy Algorithm for the No-Idle Permutation Flowshop Scheduling Problem with Total Flowtime Criterion

Tasgetiren, MF, Pan, QK, Wang, L, Chen, AHL

ADVANCED INTELLIGENT COMPUTING THEORIES AND APPLICATIONS: WITH ASPECTS OF ARTIFICIAL INTELLIGENCE[0302-9743], Published 2012, Volume 6839, Pages 83-90

收录情况: WOS

找找相关文章


-----------------------------------------------------------------

85.A hybrid dynamic harmony search algorithm for identical parallel machines scheduling

Chen, J, Pan, QK, Wang, L, Li, JQ

ENGINEERING OPTIMIZATION[0305-215X], Published 2012, Volume 44, Issue 2, Pages 209-224

收录情况: WOS SCOPUS

WOS核心合集引用:5 影响因子: 1.38 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

86.An estimation of distribution algorithm for solving hybrid flow-shop scheduling problem

Wang, Shengyao, Wang, Ling, Xu, Ye, Zhou, Gang

Zidonghua Xuebao/Acta Automatica Sinica[0254-4156], Published 2012, Volume 38, Issue 3, Pages 437-443

收录情况: SCOPUS

找找相关文章 PlumX Metrics


-----------------------------------------------------------------

87.Advances in estimation of distribution algorithms

Wang, Shengyao, Wang, Ling, Fang, Chen, Xu, Ye

Kongzhi yu Juece/Control and Decision[1001-0920], Published 2012, Volume 27, Issue 7, Pages 961-974

收录情况: SCOPUS

找找相关文章


-----------------------------------------------------------------

88.A compact estimation of distribution algorithm for solving hybrid flow-shop scheduling problem

Wang, Shengyao, Wang, Ling, Xu, Ye

Proceedings of the World Congress on Intelligent Control and Automation (WCICA), Published 2012, Pages 649-653

收录情况: SCOPUS

找找相关文章 PlumX Metrics


-----------------------------------------------------------------

89.A hybrid algorithm based on simplex search and differential evolution for hybrid flow-shop scheduling

Xu, Ye, Wang, Ling, Wang, Shengyao

Proceedings of the World Congress on Intelligent Control and Automation (WCICA), Published 2012, Pages 643-648

收录情况: SCOPUS

找找相关文章 PlumX Metrics


-----------------------------------------------------------------

90.An artificial bee colony algorithm for solving hybrid flow-shop scheduling problem with unrelated parallel machines

Wang, Ling, Zhou, Gang, Xu, Ye, Wang, Shengyao

Kongzhi Lilun Yu Yingyong/Control Theory and Applications[1000-8152], Published 2012, Volume 29, Issue 12, Pages 1551-1557

收录情况: SCOPUS

找找相关文章


-----------------------------------------------------------------

91.求解混合流水车间调度问题的分布估计算法

王圣尧,王凌,许烨,周刚

自动化学报[0254-4156], Published 2012, Issue 03, Pages 119-125

收录情况: CNKI

找找相关文章


-----------------------------------------------------------------

92.分布估计算法研究进展

王圣尧,王凌,方晨,许烨

控制与决策[1001-0920], Published 2012, Issue 07, Pages 4-9+17

收录情况: CNKI

找找相关文章


-----------------------------------------------------------------

93.求解不相关并行机混合流水线调度问题的人工蜂群算法

王凌,周刚,许烨,王圣尧

控制理论与应用[1000-8152], Published 2012, Issue 12, Pages 38-44

收录情况: CNKI

找找相关文章


-----------------------------------------------------------------

94.A chaotic harmony search algorithm for the flow shop scheduling problem with limited buffers

Pan, QK, Wang, L, Gao, L

APPLIED SOFT COMPUTING[1568-4946], Published 2011, Volume 11, Issue 8, Pages 5270-5280

收录情况: WOS SCOPUS

WOS核心合集引用:33 影响因子: 2.857 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

95.An effective hybrid biogeography-based optimization algorithm for parameter estimation of chaotic systems

Wang, L, Xu, Y

EXPERT SYSTEMS WITH APPLICATIONS[0957-4174], Published 2011, Volume 38, Issue 12, Pages 15103-15109

收录情况: WOS SCOPUS

WOS核心合集引用:22 影响因子: 2.981 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

96.An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem

Wang, L, Fang, C

INFORMATION SCIENCES[0020-0255], Published 2011, Volume 181, Issue 20, Pages 4804-4822

收录情况: WOS SCOPUS

WOS核心合集引用:41 影响因子: 3.364 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

97.Differential evolution algorithm for hybrid flow-shop scheduling problems

Xu, Y, Wang, L

JOURNAL OF SYSTEMS ENGINEERING AND ELECTRONICS[1004-4132], Published 2011, Volume 22, Issue 5, Pages 794-798

收录情况: WOS SCOPUS

WOS核心合集引用:9 影响因子: 0.468 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

98.A hybrid harmony search algorithm for the blocking permutation flow shop scheduling problem

Wang, L, Pan, QK, Tasgetiren, MF

COMPUTERS & INDUSTRIAL ENGINEERING[0360-8352], Published 2011, Volume 61, Issue 1, Pages 76-83

收录情况: WOS SCOPUS

WOS核心合集引用:47 影响因子: 2.086 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

99.A unified framework for population-based metaheuristics

Liu, B, Wang, L, Liu, Y, Wang, SY

ANNALS OF OPERATIONS RESEARCH[0254-5330], Published 2011, Volume 186, Issue 1, Pages 231-262

收录情况: WOS SCOPUS

WOS核心合集引用:14 影响因子: 1.406 找找相关文章 PlumX Metrics


-----------------------------------------------------------------

100.Center Based Genetic Algorithm and its application to the stiffness equivalence of the aircraft wing

Zhao, JQ, Wang, L

EXPERT SYSTEMS WITH APPLICATIONS[0957-4174], Published 2011, Volume 38, Issue 5, Pages 6254-6261

收录情况: WOS SCOPUS

WOS核心合集引用:7 影响因子: 2.981 找找相关文章 PlumX Metrics

相关话题/清华大学 学者 列表