田康生1,
刘仁争1,
郑玉军2
1.空军预警学院预警情报系 武汉 430019
2.中国人民解放军94710部队 无锡 214000
基金项目:国家863计划(2015AA7056045),国家自然科学基金(61601510)
详细信息
作者简介:杨善超:男,1992年生,博士生,研究方向为相控阵雷达资源管理、预警情报组网
田康生:男,1963年生,教授,博士生导师,研究方向为相控阵雷达资源管理、预警情报组网
刘仁争:男,1980年生,博士生,研究方向为预警情报组网
郑玉军:男,1988年生,博士,研究方向为预警情报组网
通讯作者:杨善超 y_qinglinshuo@163.com
中图分类号:TN958.92计量
文章访问数:1763
HTML全文浏览量:842
PDF下载量:66
被引次数:0
出版历程
收稿日期:2019-03-13
修回日期:2019-05-24
网络出版日期:2019-08-15
刊出日期:2020-02-19
Scheduling Algorithm Based on Value Optimization for Phased Array Radar
Shanchao YANG1,,,Kangsheng TIAN1,
Renzheng LIU1,
Yujun ZHENG2
1. The Early Warning Intelligence Department, Air Force Early Warning Academy, Wuhan 430019, China
2. The Unit 94710 of The Chinese People’s Liberation Army, Wuxi 214000, China
Funds:The National 863 Program of China (2015AA7056045), The National Natural Science Foundation of China (61601510)
摘要
摘要:针对相控阵雷达时间资源分配问题,该文提出一种基于价值优化的任务调度算法。首先建立任务调度属性参数,对跟踪任务队列进行可行性分析和筛选操作,确定跟踪任务调度属性。其次,根据任务最大价值及其变化斜率,建立关于实际执行时刻的动态任务价值函数,并基于此构建任务调度的价值优化模型,对跟踪任务执行时刻进行分配,以更好满足及时性原则。最后,利用执行跟踪任务间的空闲时间片对搜索任务进行调度。仿真结果表明,该文算法有效减小了时间偏移量,提升了实现价值率。
关键词:相控阵雷达/
资源管理/
任务调度/
及时性
Abstract:A task scheduling algorithm based on value optimization is proposed for phased array radar. Firstly, the schedulability of tracking tasks is obtained through feasibility analysis and selecting operation on the task queue, using the proposed schedulability parameters. Then, a dynamic task value function about the actual execution time is established according to the peak value and value changing slope of tasks. A value optimization model for tracking task scheduling is constructed based on the task value function. Timeliness can be better achieved while adopting this model to assign execution time for tasks. Finally, searching tasks are scheduled using the idle time intervals between tracking tasks which are going to be executed. Simulation results show that proposed algorithm reduces the average time shift ratio, and improves the value achieving ratio compared with the traditional scheduling algorithms.
Key words:Phased array radar/
Resource management/
Task scheduling/
Timeliness
PDF全文下载地址:
https://jeit.ac.cn/article/exportPdf?id=4db9fc05-f8a9-4f5a-b2f7-98980d466ec2