删除或更新信息,请邮件至freekaoyan#163.com(#换成@)

香港大学工程学院导师教师师资介绍简介-George G.Q. Huang

本站小编 Free考研考试/2021-12-04

George G.Q. Huang

Chair Professor in Industrial and Systems Engineering
Head of Department
Email:gqhuang@hku.hk
Tel:3917 2588 / 3917 2591
Office:HW 8-18 / 8-13


Biography

Prof. GeorgeG.Q.Huang is Chair Professor and Head of Department in Department of Industrial and Manufacturing Systems Engineering, The University of Hong Kong. He gained his BEng and PhD in Mechanical Engineering from Southeast University (China) and Cardiff University (UK) respectively. He has conducted research projects in the field of Physical Internet (Internet of Things) for Manufacturing and Logistics with substantial government and industrial grants. He has published extensively including over two hundred refereed journal papers in addition to over 200 conference papers and ten monographs, edited reference books and conference proceedings. His research works have been widely cited in the relevant field. He serves as associate editors and editorial members for several international journals. He is a Chartered Engineer (CEng), a fellow of ASME, HKIE, IET and CILT, and member of IIE.

Honours & Awards

Prof. George G.Q.Huang has been serving on editorial boards of a number of international journals. He is Editor for Asia Pacific for International Journal of Computer Integrated Manufacturing, Associate Editor of International Journal of Production Research, Area Editor for Business & Management for International Journal of Research in Engineering Design, and Associate Editor for Journal of Intelligent Manufacturing.
Prof. GeorgeG.Q.Huang received 2014 First-Class Guangdong Province (Department of Science and Technology) on "Mass-Customized Design and Production System", 2007 First-Class Natural Science Award from Chinese Ministry of Education on "Service-oriented manufacturing execution in extended enterprises", 2007 Outstanding Young Researcher Award (Overseas) from Natural Science Foundation of China and 2001 The University of Hong Kong Outstanding Young Researcher Award.

Selected Publications

ZHOUY., Wang J. andHuang G.Q., 2019.Efficiency and robustness of weighted air transport networks,Transportation Research Part E: Logistics and Transportation Review, 122: 14-26.
Xue F., Chen K., Lu W.,NIUY.andHuang G.Q., 2018.Linking radio-frequency identification to Building Information Modeling: Status quo, development trajectory and guidelines for practitioners,Automation in Construction, 93: 241-251.
Kong X., Xu S., Cheng M. andHuang G.Q., 2018. IoT-enabled Parking Space Sharing and Allocation Mechanisms,IEEE Transactions on Automation Science and Engineering.
Kong X.,Huang G.Q.and Luo H., 2018. Industrial Wearable System: the Human-centric Empowering Technology in Industry 4.0,Journal of Intelligent Manufacturing.
Kong X.,Huang G.Q., Luo H. and Yen B.P., 2018. Auction Logistics in Perishable Supply Chain Trading: State-of-the-art and Research Opportunities,Industrial Management & Data System.
ZhongR.Y.,PengY., Xue F., Fang J., Zou W., Luo H., Ng T.S.T., Lu W.,ShenQ.P.andHuang G.Q.,2017.Prefabricated construction enabled by the Internet-of-Things,Automation in Construction, 76: 59-70.
ZhongR.Y.,XuC.,ChenC.andHuang G.Q., 2017.Big Data Analytics for Physical Internet-based intelligent manufacturing shopfloors,International Journal of Production Research., 55: 2610-2621.
Zhao Z., Fang J.,Huang G.Q.and Zhang M., 2017.Location Management of Cloud Forklifts in Finished Product Warehouse,International Journal of Intelligent Systems.
ZHANGM., Pratap S.,Huang G.Q.andZHAOZ.,2017. Optimal collaborative transportation service trading in B2B e-commerce logistics,International Journal of Production Research., 55: 5485-5501.
ZHAIY., Zhong R., Li Z. andHuang G.Q., 2017.Production lead-time hedging and coordination in prefabricated construction supply chain management,International Journal of Production Research., 55: 3984-4002.
XuS.X.andHuang G.Q., 2017.Efficient Multi-Attribute Multi-Unit Auctions for B2B E-Commerce Logistics,Production and Operations Management, 26: 292-304.
Xu G.,Huang G.Q., Fang J. and Chen J., 2017.Cloud-based smart asset management for urban flood control,Enterprise Information Systems., 11: 719-737.
XUG., Wang J.,Huang G.Q.andChenC.,2017. Data-Driven Resilient Fleet Management for Cloud Asset-enabled Urban Flood Control,IEEE Transactions on Intelligent Transportation Systems., 1-12.
Wang H.,FuY.,HuangM.,Huang G.Q.and Wang J., 2017.A hybrid evolutionary algorithm with adaptive multi-population strategy for multi-objective optimization problems,Soft Computing., 21: 5975-5987.
Wang H.,FuY.,HuangM.,Huang G.Q.and Wang J., 2017.A NSGA-II based memetic algorithm for multiobjective parallel flowshop scheduling problem,Computers & Industrial Engineering.
Wang H.,FuY.,HuangM.,Huang G.Q.and Wang J., 2017.A NSGA-II based memetic algorithm for multiobjective parallel flowshop scheduling problem,Computers & Industrial Engineering.
Lan S., Yang C. andHuang G.Q.,2017. Data analysis for metropolitan economic and logistics development,Advanced Engineering Informatics., 32: 66-76.
Kong X., Chen G.,Huang G.Q.and Luo H.,2017.Ubiquitous auction learning system with TELD (Teaching by Examples and Learning by Doing) approach: A quasi-experimental study,Computers & Education., 111: 144-157.
Kong X., Zhong R., Xu G. andHuang G.Q.,2017. Robot-enabled execution system for perishables auction logistics,Industrial Management & Data Systems., 117: 1954-1971.
Huang G.Q., Lan S. and Yang C., 2017. Data analysis for metropolitan economic and logistics development,Advanced Engineering Informatics., 32: 66-76.
Chen J., Wang M., Kong X.,Huang G.Q.,DaiQ.andShiG.,2017. Manufacturing synchronization in a hybrid flowshop with dynamic order arrivals,Journal of Intelligent Manufacturing.
CHENK., Lu W.,WangH.D.,NIUY.andHuang G.Q., 2017.Naming Objects in BIM: A Convention and a Semiautomatic Approach,Journal of Construction Engineering and Management. **.
Zhong R.,LANS.,XuC.,DaiQ.andHuang G.Q.,2016.Visualization of RFID-enabled shopfloor logistics Big Data in Cloud Manufacturing,The International Journal of Advanced Manufacturing Technology., 84: 5-16.
Zhang M.,Huang G.Q., Xu S. and Zhao Z.,2016. Optimization based transportation service trading in B2B e-commerce logistics,Journal of Intelligent Manufacturing.
Xu S.,Huang G.Q.and Cheng M.,2016. Truthful, Budget-Balanced Bundle Double Auctions for Carrier Collaboration,Transportation Science.
Xu S., Cheng M., Kong X.,YangH.andHuang G.Q., 2016.Private parking slot sharing,Transportation Research Part B: Methodological. 93: 596-617.
WangJ.Q.,CHENJ.,ZhangY.Q.andHuang G.Q., 2016. Schedule-based execution bottleneck identi?cation in a job shop.Computers & Industrial Engineering.
LANS.,ZhangH., Zhong R. andHuang G.Q.,2016. A customer satisfaction evaluation model for logistics services using fuzzy analytic hierarchy process,Industrial Management & Data Systems.
Kong X., Chen J., Luo H. andHuang G.Q., 2016.Scheduling at an auction logistics centre with physical internet,International Journal of Production Research., 54: 2670-2690.
Cheng M., Xu S. andHuang G.Q., 2016.Truthful multi-unit multi-attribute double auctions for perishable supply chain trading,Transportation Research Part E: Logistics and Transportation Review., 93: 21-37.
Zhong R.,Huang G.Q.,LANS.,DaiQ.Y.,ZhangT.andXuC., 2015.A two-level advanced production planning and scheduling model for RFID-enabled ubiquitous manufacturing,Advanced Engineering Informatics., 29: 799-812.
Zhong R.,Huang G.Q.,LANS.,DaiQ.Y.,ChenX.andZhangT., 2015.A big data approach for logistics trajectory discovery from RFID-enabled production data,International Journal of Production Economics., 165: 260-272.
ZHAIY., Zhong R. andHuang G.Q., 2015.Towards Operational Hedging for Logistics Uncertainty Management in Prefabrication Construction,IFAC-PapersOnLine., 48: 1128-1133.
XuS.andHuang G.Q., 2015.Auction-based transportation procurement in make-to-order systems,IIE Transactions., 47: 1236-1251.
Xu S., Cheng M. andHuang G.Q.,2015. Efficient intermodal transportation auctions for B2B e-commerce logistics with transaction costs,Transportation Research Part B: Methodological., 80: 322-337.
Qiu X., Luo H.,XUG., Zhong R. andHuang G.Q.,2015. Physical assets and service sharing for IoT-enabled Supply Hub in Industrial Park (SHIP),International Journal of Production Economics., 159: 4-15.
PangL.Y.,LiZ.,Huang G.Q., Zhong R.,PanY.and Qu T.,2015. Reconfigurable Auto-ID Enabled Software as a Service (SaaS) Shell for Real-Time Fleet Management in Industrial Parks,Journal of Computing in Civil Engineering., 29: **.
Pang L.Y., Zhong R., Fang J. andHuang G.Q.,2015. Data-source interoperability service for heterogeneous information integration in ubiquitous enterprises,Advanced Engineering Informatics., 29: 549-561.
PANGL.Y.,LIZ.,Huang G.Q.,ZHONGR.,PANY.and Qu T., 2015. Auto-ID Enabled Reconfigurable SaaS Shell for Real-Time Fleet Management in Industrial Parks,Journal of Computing in Civil Engineering, 29.
NIUY., Lu W.,CHENK.,Huang G.Q.andAnumbaC.H.I.M.A.Y.,2015. Smart Construction Objects,Journal of Computing in Civil Engineering, **.
MukundJ.N.,Huang G.Q.andPonnambalamS.G., 2015. An investigation on minimizing cycle time and total energy consumption in robotic assembly line systems,Journal of Cleaner Production.
LUOH.,FANGJ.andHuang G.Q.,2015. Real-time scheduling for hybrid flowshop in ubiquitous manufacturing environment,Computers & Industrial Engineering., 84: 12-23.
KONGX., Fang J., Luo H. andHuang G.Q.,2015. Cloud-enabled real-time platform for adaptive planning and control in auction logistics center,Computers & Industrial Engineering., 84: 79-90.
CHENK., Lu W.,PengY., Rowlinson S.M. andHuang G.Q.,2015. Bridging BIM and building: From a literature review to an integrated conceptual framework.,International Journal of Project Management., 33(6): 1405–1416.
CHENJ.,Huang G.Q., Luo H. andWangJ.,2015. Synchronisation of production scheduling and shipment in an assembly flowshop,International Journal of Production Research., 53: 2787-2802.
Xu, S. X., Huang, G.Q., 2014. Efficient auctions for distributed transportation procurement. Transportation Research Part B, 56, 136-160.
XuS.andHuang G.Q.,2014. Efficient auctions for distributed transportation procurement,Transportation Research Part B: Methodological, 65: 47-64.
Huang, G. Q., Xu, S. X., 2013. Truthful multi-unit transportation procurement auctions for logistics e-marketplaces. Transportation Research Part B, 47, 127-148.
XuS.andHuang G.Q.,2013. Transportation service procurement in periodic sealed double auctions with stochastic demand and supply,Transportation Research Part B: Methodological, 56: 136-160.
RY Zhong, QY Dai, T Qu, GJ Hu, GQ Huang, 2013, RFID-enabled real-time manufacturing execution system for mass-customization production, Robotics and Computer-Integrated Manufacturing, Volume 29, Issue 2, April 2013, Pages 283–292.
Zhong R., Li Z., Pang L.Y., Pan Y., Qu T. andHuang G.Q., 2013. RFID-enabled real-time advanced planning and scheduling shell for production decision making,International Journal of Computer Inetgrated Manufacturing., 26: 649-662.
XuS.,LuQ.,Huang G.Q.andZhangT., 2013. Scope economies, market information, and make-or-buy decision under asymmetric information,International Journal of Production Economics, .45 (1): 339-348.
WangJ.Q.,ZhangZ.T.,CHENJ.,GuoY.Z.,WangS.,SunS.Z., Qu T. andHuang G.Q., 2013. C-Based Algorithm for Solving Multiple Constraint Resources: a Re-examination,IEEE Transactions on Engineering Management, 61(1): 138-146.
Sun J.,WuJ.,LiangL., Zhong R. andHuang G.Q., 2013. Allocation of emission permits using DEA: centralised and individual points of view,International Journal of Production Research.
QIUX.andHuang G.Q., 2013. Storage pricing, replenishment, and delivery schedules in a supply hub in industrial park: A bilevel programming approach,International Journal of Production Research., 51(23-24): 6950-6971.
Huang G.Q.andQIUX., 2013. Supply hub in Industrial Park: The value of freight consolidation,Computers and Industrial Engineering., 65 (1): 16-27.
Huang G.Q., Zhang T. and Qu T., 2013. Headquarter-centered Common Order Management: A simulation approach,Production Planning & Control.
Fang J.,Huang G.Q.and Li Z., 2013. Event-driven multi-agent ubiquitous manufacturing execution platform for shopfloor WIP management,International Journal of Production Research.
Fang J. andHuang G.Q., 2013. Agent-based gateway operating system for RFID-enabled ubiquitous manufacturing enterprises,Robotics and Computer Integrated Manufacturing.
Zhong R.,Huang G.Q.,DaiQ.Y.andZhangT., 2013. Mining SOTs and Dispatching Rules from RFID-enabled Real-time Shopfloor Production Data,Journal of Intelligent Manufacturing. DOI: 10.1007/s10845-012-0721-y.
ZhangA.,Huang G.Q.andLIUX.M., 2012. Impacts of business environment changes on global manufacturing in the Chinese Greater Pearl River Delta: a supply chain perspective,Applied Economics., 44: 4505–4514.
WangM.L.,DaiQ.Y., Zhong R. andHuang G.Q., 2012. RFID-enabled mechanical workshop training center,International Journal of Engineering Education.
ThurerM.,Huang G.Q.,StevensonM.A.R.K.,SilvaC.R.I.S.T.O.V.A.O.andFilhoM.G., 2012. The performance of Due Date setting rules in assembly and multi-stage job shops: an assessment by simulation,International Journal of Production Research., (50)20: 5949-5965.
ThürerM.A.T.T.H.I.A.S.,StevensonM.A.R.K.,SilvaC.R.I.S.T.O.V.A.O.andHuang G.Q., 2012. The application of workload control in assembly job shops: an assessment by simulation,International Journal of Production Research., (50)18: 5048-5062.
Qu T., Yang H.,Huang G.Q., Zhang Y., Luo H. andQinW.,2012. A Case of Implementing RFID-Based Real-Time Shop-Floor Material Management for Household Electrical Appliance Manufacturers, In: Andrew Kusiak,Journal of Intelligent Manufacturing, 23: 2343-2356.
Luo H.,Huang G.Q.,ShiY., Qu T. andZhangY.F.,2012. Hybrid flowshop scheduling with family setup time and inconsistent family formation, In: A. Dolgui,International Journal of Production Research. Taylor and Francis, 50: 1457-1475.
Huang G.Q., Qu T., Zhang Y. and Yang H., 2012. RFID-enabled product-service system for automotive part and accessory manufacturing alliances,International Journal of Production Research.
Fang J.,Huang G.Q., Qu T. and Zhang Y., 2012. RFID-enabled event processing application framework for real-time manufacturing,International Journal of Service Operations and Informatics.
DaiQ.Y., Zhong R.,Huang G.Q., Qu T., Zhang Y. and Luo H., 2012. RFID-enabled real-time manufacturing execution system: A case study in an automotive part manufacturer,International Journal of Computer Integrated Manufacturing.
Y Huang, GQ Huang, ST Newman, 2011, Coordinating pricing and inventory decisions in a multi-level supply chain: A game-theoretic approach, Transportation Research Part E: Logistics and Transportation Review, Volume 47, Issue 2, March 2011, Pages 115–129
Zhang Y., Qu T.,HoK.W.andHuang G.Q.,2011. Agent-based Smart Gateway for RFID-enabled real-time wireless manufacturing,International Journal of Production Research. UK, Taylor & Francis, 49: 1337-1352.
Zhang Y.,Huang G.Q.and Qu T., 2011. RFID-enabled real-time manufacturing information tracking infrastructure for extended enterprises,Journal of Intelligent Manufacturing.
Qu T.,ChenX.D.,ZhangY.F.,YangH.D.andHuang G.Q.,2011. Analytical Target Cascading-enabled Optimal Configuration Platform For Production Service Systems, In: Stephen Newman,International Journal of Computer Integrated Manufacturing.UK, Taylor & Francis, 24: 457-470.
Luo H.,Huang G.Q., Zhang Y. andDaiQ.Y.,2011. Hybrid Flowshop Scheduling with Batch-Discrete Processors and Machine Maintenance in Time Windows,International Journal of Production Research, 49: 1575 – 1603.
Lu W.,Huang G.Q.andLiH., 2011. Scenarios for applying RFID technology in construction project management,Automation in Construction, 20: 101-106. (Publication No. : 189304)
HuangS.X.,ZengS.,FanY.S.andHuang G.Q., 2011. Optimal service selection and composition for service-oriented manufacturing network,International Journal of Computer Integrated Manufacturing., 24(5): 416-430.
Huang G.Q., Zhang Y., Qu T. andMaropoulosP.G., 2011. Special issue on ‘6th CIRP-Sponsored International Conference of Digital Enterprise Technology (DET2009) - Enterprise Informatics’,International Journal of Computer Integrated Manufacturing. Taylor & Francis, 24(5): 375-377.
Huang G.Q., Qu T.,FangJ.andBramleyA.N.,2011. RFID-enabled Gateway Product Service System for Collaborative Manufacturing Alliance,CIRP Annals - Manufacturing Technology. Elsevier, 60: 465-468.
Huang G.Q., Qu T., Zhang Y. andMaropolousP.G., 2011. Guest editorial: digital enterprise technology,Journal of Intelligent Manufacturing.
FangJ.,Huang G.Q., Qu T. and Zhang Y.,2011. RFID-Enabled Complex Event Processing Application Framework for Real-Time Manufacturing,International Journal of Services Operations and Informatics, 6: 30-44.
ChenH.P., Du B. andHuang G.Q., 2011. Scheduling a batch processing machine with non-identical job sizes: A clustering perspective,International Journal of Production Research.
Zhang X.,Huang G.Q.,HumphreysP.K.andBotta-GenoulazV.A.L.E.R.I.E., 2010. Simultaneous configuration of platform products and manufacturing supply chains: comparative investigation into impacts of different supply chain coordination schemes,Production Planning and Control international Journal.
ZhangX.Y.,Huang G.Q.,SongH.Y.and Chen W., 2010. A Game-Theoretic Approach to Tourism Supply Chain Coordination under Demand Uncertainty,Tourism Analysis: An Interdisciplinary Journal, Vol 15, No 3: 287-298.
Zhang A. andHuang G.Q., 2010. A multi-period mixed integer programming model for the problem of relocating a global manufacturing facility,Journal of the Chinese Institute of Industrial Engineers. Taylor and Francis.
YuY.U.G.A.N.G.andHuang G.Q., 2010. Nash game model for optimizing market strategies, configuration of platform products in a vendor managed inventory (VMI) supply chain for a product family,European Journal of Operational Research.
Lu H.,Huang G.Q.and Yang H., 2010. Integrating order review/release and dispatching rules for assembly job shop scheduling using a simulation approach,International Journal of Production Research.
Huang Y. andHuang G.Q., 2010. Coordinating Pricing and Inventory Decisions in a Multi-Level Supply Chain: A Game-Theoretic Approach,Transportation Research Part E.
Huang Y. andHuang G.Q., 2010. Price Coordination in a Three-level Supply Chain with Different Channel Structures Using Game-theoretic Approach,International Journal of Management Science and Engineering Management.
Huang G.Q., Qu T., Li Z., Zhong R., Yang H.,DaiQ.Y.,ChenX.andChenQ.X.,2010 .Establishing Production Service System and Information Collaboration Platform for Mould and Die Products,International Journal of Advanced Manufacturing Technology, Online Published First.
Huang G.Q., Chen W.,SongH.Y.andZhangX.Y., 2010. Game-theoretic study of the dynamics of tourism supply chains for package holidays under quantity competition,Tourism Economics, 16(1): 197–216.
Huang G.Q., Chen W.,SongH.Y.andZhangX.Y., 2010. A Comparative Analysis of Quantity and Price Competitions in Tourism Supply Chain Networks for Package Holidays,Service Industries Journal.
Huang G.Q., Zhang, Y.F., Chen, X., Newman, ST., 2008, RFID-Enabled Real-Time Wireless Manufacturing for Adaptive Assembly Planning and Control, Journal of Intelligent Manufacturing, Vol 19, No 6, 701-713
Zhang, Y.F., Jiang, P.Y., Huang G.Q., 2008, RFID-Based Smart Kanbans for Just-In-Time Manufacturing, International Journal of Materials and Product Technology, Vol. 33, No. 1-2, 170-184.
Huang G.Q., Zhang, Y.F., Jiang, P.Y., 2007, RFID-Based Wireless Manufacturing for Walking-Worker Assembly Islands with Fixed-Position Layouts, International Journal of Robotics and Computer Integrated Manufacture, Vol 23/4 pp 469-477.
Huang G.Q., Zhang, Y.F., Jiang, P.Y., 2007, RFID-Based wireless manufacturing for real-time management of job shop WIP inventories, International Journal of Advanced Manufacturing Technology, 7-8(36), 752-764.
Huang, GQ., Wright, PK., Newman, ST., 2007, Wireless Manufacturing: a literature review, recent developments and case studies, International Journal of Computer Integrated Manufacturing, Volume 22, Issue 7 July 2009 , pages 1 - 16.
Huang G.Q., Zhang X. and Lo V.H.Y., Integrated configuration of platform products and supply chains for mass customization: a game-theoretic approach, Journal of IEEE Transactions on Engineering Management, 2005
Huang G.Q., Zhang X. and Liang L., Towards integrated optimal configuration of platform products, manufacturing processes, and supply chains, Journal of Operations Management, 2005, 23, 267-290
Huang G.Q., Simpson T.W. and Pine II B.J., The power of product platforms in mass customization, International Journal of Mass Customization, 2005, 1(1), 1-13
Huang G.Q., Lau S.K. and Mak K.L., The impacts of sharing production information on supply chain dynamics: a review of the literature, International Journal of Production Research, 2003, 41(7), 1483-1517
Huang G.Q., Lau S.K., Mak K.L. and Liang L., Distributed supply-chain project rescheduling: part I: Impacts of information-sharing strategies, International Journal of Production Research, Volume 43, Number 24, 15Dec2005, 5107 - 5129.
Huang G.Q., Lau S.K., Mak K.L. and Liang L., Distributed supply-chain project rescheduling, part II - Distributed affected operations rescheduling algorithm, International Journal of Production Research, Volume 44, Number 1, January 2006 Pages: 1 - 25.
Lau S.K., Huang G.Q., Mak K.L. and Liang L., Distributed project scheduling with information sharing in supply chains: part I - An agent-based negotiation model, International Journal of Production Research, Volume 43, Number 22, November 2005 Pages: 4813 - 4838.
Lau S.K., Huang G.Q., Mak K.L. and Liang L., Distributed project scheduling with information sharing in supply chains: part II - Theoretical analysis and computational study, International Journal of Production Research, Volume 43, Number 23, December 2005 Pages: 4899 - 4927.
Lau S.K., Huang G.Q., Mak K.L. and Liang L., An agent-based information model for distributed supply chain scheduling, IEEE Transactions on Systems, Man, and Cybernetics, Part A, 2006
Lau S.K., Huang G.Q. and Mak K.L., Impact of information sharing on inventory replenishment in divergent supply chains, International Journal of Production Research, 2004, 42(5), 919-941
Huang G.Q., Qu T., Cheung D.W.L. and Liang L., Extensible multi-agent system for optimal design of complex systems using analytical target cascading, International Journal of Advanced Manufacturing Technology , 2006
Huang G.Q. and Mak K.L., Brokering the customer-supplier partnership in product design and realization over the World Wide Web, IIE Transactions, 2003, 35(4), 369-378
Huang G.Q., Yee W.Y. and Mak K.L., Development of a web-based system for engineering change management, International Journal of Robotics and Computer Integrated Manufacture, 2001, 17(3), 255-267
Huang, GQ, Mak, KL (2001) ※Web-integrated manufacturing: Recent developments and Emerging issues§, International Journal of Computer Integrated Manufacture, 2001, 14(2): 3-13.
Huang, GQ, Mak, KL (1999) ※Web-Based Morphological Chart Analysis for Innovative Conceptual Design in Collaborative Product Development§, International Journal of Intelligent Manufacturing, Vol. 10, No. ¾, 267-278.
Huang, GQ, Mak, KL (2000) ※WeBid: A Web-Based Framework to Support Early Supplier Involvement in New Product Development§, International Journal of Robotics and Computer Integrated Manufacture, Vol. 16, 169-179.
Huang, GQ, Mak, KL (1999) ※Modelling the Customer-Supplier Interface over the World Wide Web to Facilitate Early Supplier Involvement in New Product Development§, Institution of Mechanical Engineers Proceedings, Part B Journal of Engineering Manufacture, 2000, B214(9): 759-769.
Huang, GQ, Mak, KL (2001) ※Issues in the Development and Implementation of Web Applications for Product Design and Manufacture§, International Journal of Computer Integrated Manufacture, 2001, 14(2): 125-135.
Huang, GQ, Mak, KL (1999) ※Web-Based Collaborative Conceptual Design§, Journal of Engineering Design, Vol. 10, No. 2, 183-194.
Huang, GQ, Lee, SW, Mak, KL (1999) ※Web-based product and process data modelling in concurrent &Design for X*§, International Journal of Robotics and Computer Integrated Manufacturing, Vol. 15, No. 1, 53-63.
Huang G.Q., Web-based support for collaborative product design review, International Journal of Computers in Industry, 2002, 48(1), 71-88
Huang, GQ, Mak, KL (1999) ※Web-Based Design for Manufacture and Assembly§, Computers in Industry: An International Journal, Vol. 38, No. 1, 17-30.
Huang, G Q (1994) "Agent-based framework for cooperating concurrent engineering systems", International Journal of Artificial Intelligence with Engineering Applications, Vol 7, No 6, 678-681
Huang, GQ, Huang, J, Mak, KL (2000) ※Agent-based workflow management in collaborative product development on the Internet§, International Journal of Computer Aided Design, 2000, 32 (2): 133-144.





相关话题/工程学院 香港大学