删除或更新信息,请邮件至freekaoyan#163.com(#换成@)

Subsystem model-based close-loop grey-box identification method for hydraulic stewart platform

本站小编 哈尔滨工业大学/2019-10-23

Subsystem model-based close-loop grey-box identification method for hydraulic stewart platform

TANG Jian-lin, DONG Yan-liang, ZHAO Ke-ding

School of Mechatronics Engineering,Harbin Institute of Technology,Harbin 150001,China



Abstract:

In order to solve the problem of difficult modeling and identification caused by time-variable parameters,multiple inputs and outputs and unstable open loop,a subsystem model-based close-loop grey-box identification method was put forward when consider the main coupling effects of hydraulic Stewart platform.Firstly,the whole system is divided into three TITO(Two Input Two Output) subsystems according to the characteristics of the pseudo-mass matrix,hence transfer function matrix model of the subsystem can also be found.Secondly,since the Stewart platform is unstable,the close-loop transfer model of the subsystem is derived under the proportional controllers.The inverse M serial is adopted as the identification signal to get the experimental data.All parameters of the subsystem are determined in close-loop indirect identification by PEM(Prediction Error Method).Finally,a case study validates the correctness and effectiveness of the subsystem model-based close-loop grey-box identification method for hydraulic Stewart platform.

Key words:  hydraulic Stewart platform  pseudo-mass matrix  prediction error method  close-loop indirect identification  grey-box model

DOI:10.11916/j.issn.1005-9113.2011.02.022

Clc Number:TH137

Fund:


相关话题/Subsystem model-based close-loop grey-box identification method hydraulic stewar