删除或更新信息,请邮件至freekaoyan#163.com(#换成@)

清华大学工业工程系研究生导师简介-成晔,副教授,工学博士(清华大学),系主任助理

清华大学 免费考研网/2013-06-07




电子邮件:chengye@tsinghua.edu.cn
办公地点:清华大学舜德楼北503
办公电话:+86-10-6278-4548
传真号码:+86-10-6279-4399
教师主页:http://oa.ie.tsinghua.edu.cn/~chengye

(null)

  1. AwardofAchievementinTeaching(SharedwithProf.Zheng,L.,Prof.Zhao,X.,Prof.Zhang,Z.,andProf.Liu,D.),FirstClass,TsinghuaUniversity(2006)
  2. AwardofAchievementinLaboratoryTechnology(SharedwithMs.Yan,J.,Ms.Wang,H.,andMr.Song,Z.),SecondClass,TsinghuaUniversity(2006)
  3. OutstandingFacultyandStaffAward,TsinghuaUniversity.(2005)
    4.ExcellentSupervisorAward,AssociationofGraduateStudents,TsinghuaUniversity.(2004,2005)
  4. OutstandingTeamAward(SharedwithProf.Zheng,L.,Prof.Zhao,X.,Prof.Zhang,Z.,andProf.Liu,D.Prof.Li,Z.,Prof.Yu,M.,andMs.Wang,X.),TsinghuaUniversity(2004)
  5. AwardofAchievementinTeaching(SharedwithProf.Zheng,L.,Prof.Wu,S.,Prof.Zhao,X.,andProf.Yu,R.),SecondClass,TsinghuaUniversity(2004)
  6. AwardofExcellentAdviserofStudentClass,TsinghuaUniversity(2003)
  7. Science&TechnologyAwardofChineseUniversitiesandColleges(SharedwithProf.Feng,Z.,Prof.Wang,J.,Mr.Cao,R.,andMr.Zhao,G.),FirstClass,MinistryofEducation,China(2001)
  8. High-EducationAchievementAward(SharedwithProf.Feng,Z.,Prof.Wang,J.,Prof.Yu,D.,andProf.Liu,C.),SecondClass,GovernmentofBeijingCity(2001)
  9. Science&TechnologyProgressAward(SharedwithProf.Xiong,G.,Prof.Cai,F.,Dr.Zhang,Y.,andMr.Zhu,W.,etc.),SecondClass,MinistryofEducation,China(1999)
  10. OutstandingYoungFacultyAward,SecondClass,TsinghuaUniversity(1995,1997)
  11. OutstandingTeamAward(SharedwithProf.Wang,J.,andProf.Yu,D.),TsinghuaUniversity(1996)


-----------------------------------------------------------------

  • DepartmentofPrecisionInstrumentsandMechanology,TsinghuaUniversity,Beijing,China,1992
    DoctorofPhilosophyinManufacturingEngineering
  • DepartmentofPrecisionInstrumentsandMechanology,TsinghuaUniversity,Beijing,China,1988
    MasterofScienceinManufacturingEngineering
  • DepartmentofPrecisionInstrumentsandMechanology,TsinghuaUniversity,Beijing,China,1985
    BachelorofScienceinMechanicalEngineering



-----------------------------------------------------------------

DepartmentofIndustrialEngineering,TsinghuaUniversity,Beijing,China
AssociateProfessor(10/01–present)LaboratoryofMachineToolandProductionEngineering,RwthAachen(AachenUniversityofTechnology),Germany
VisitingProfessor(10/04–12/04)
  • ReviewandreappraisaloftheProductionManagementcourseintheSino-GermanJointMastersProgram
  • JointresearchinCollaborativeManufacturingofTools,DiesandMouldsinGermanyandChina
DepartmentofPrecisionInstrumentsandMechanology,TsinghuaUniversity,Beijing,China
Lecturer(4/92–11/94)
AssistantProfessor(12/94–9/01)LaboratoryofPrcisionandIntelligence,TokyoInstituteofTechnology,Japan
VisitingResearchFellow(8/97–10/98,6/99–7/99)
  • Collaborativeresearchonvirtualcoordinatemeasuringmachineapproachesandsimulationsoftware,inordertopredictandcompensateerrorsinfast-probinginspection.



-----------------------------------------------------------------

1.Undergraduate
  • ModelingandSimulation(29studentsinFall2002;27studentsinFall2003;85studentsinSpring2004;68studentsinSpring2005;59studentsinFall2005)
  • ProductionPlanningandControl(27studentsinSpring2003;85studentsinSpring2004;68studentsinSpring2005;44studentsinSpring2006)
  • PracticeProjectinProductionSystems(27studentsinSummer2003;85studentsinSummer2004;68studentsinSummer2005;57studentsinSummer2006)
  • ManufacturingPrincipleandProcess(58studentsinSpring1994;62studentsinSpring1996)
  • ManufacturingProcessDesignProject(15studentsinFall1994;15studentsinFall1995)
  • ProjectManagement(60studentsinSpring1997)

2.Graduate
  • ProductionManagementI(41studentsinFall2004;46studentsinFall2005)
  • ProductionManagementII(4studentsinSpring2005;10studentsinSpring2006)
  • ProductionandOperationsManagement(20studentsinSpring2003;15studentsinSpring2005;65studentsinFall2005)



-----------------------------------------------------------------

(null)


-----------------------------------------------------------------

  • ProductionSystemDesign
  • ProductionPlanningandControl
  • ManufacturingExecutionSystem
  • SystemSimulation
  • QualityInspectionandControl
  • ManufacturingProcessOptimization



-----------------------------------------------------------------

ResearchProjectsatDepartmentofIndustrialEngineering,TsinghuaUniversity
  1. FeasibilityStudyofUltrasonicSensoringofCouplingsandFittings(6/06–12/06),supportedbyCaterpillar.
    Cheng,Y.(PI),Li,S.(Master),andSong,Z.(Master)
    Theobjectiveofthisprojectistoinvestigateonfeasibleapproachestomeasureandcontroltheclamping
    forceofpipecouplingsandfittings,withultrasonicstressmeasuringtechniques.
  2. TorqueSensingWrenchandDataAnalysisSystem(5/05–3/06),supportedbyCaterpillar.
    Cheng,Y.(PI),Yin,M.(Master),Wang,S.(Master),andWang,H.(Master)
    Theobjectiveofthisprojectistoresearchontechniquesofremotesignaltransmissionanddataanalysisforsuccessfulfasteningoftorquewrenchesinassemblyline.
  3. ManagementInformationSystemforResourceIntegrationofLocomotiveMaintenanceSystem(1/05–12/05),supportedbytheMinistryofRailway,China.
    Yu,M(PI),Cheng,Y.(Co-PI),Bai,J.(Master),Wang,S.(Master)andLi,X.(Master)
    TheobjectiveofthisprojectistoanalyzetheworkingprocessandrequirementsforresourceinformationintegrationinlocomotivemaintenancesystemsofChineserailway.
  4. EmergencyMaintenanceFacilityDesignforDefenseWeaponSystem(10/03–08/04),supportedbytheNo.23FactoryofChineseAirForce.
    Cheng,Y.(PI),YuanS.,Xu,J.,andWu,H.
    Theobjectivesofthisprojectaredesignandoptimizationofmobilefacilityforemergencymaintenanceof
    defenseweaponsystem.
  5. QualityImprovementofAuto-Body(10/01–8/02),SupportedbytheShenyangJinbeiAutomobileManufacturingCo.Ltd.
    Cheng,Y.(PI),Han,Z.,YuanS.,Xu,J.,Wu,B.,Wang,K.,andJiao,H.
    Theobjectiveofthisprojectistoinvestigateonsystematicmethodologytomeasureandimprovequalityofauto-body.
  6. QualityControlSystemforFinalAssemblyLine(3/00–6/02),SupportedbytheShenyangJinbeiAutomobileManufacturingCo.Ltd.
    Cheng,Y.(PI),Xu,J.,Ye,B.,Zhao,B.(PhD),Xing,G.(Master),Wang,X.(Master),Feng,Q.(Master),Wang,K.(Master)andLiu,Z.(Undergraduate)
    Theobjectiveofthisprojectistodevelopaqualitydatacollectionandanalysissystem,toensureassemblyqualityofcriticalpartsofautomobiles.
  7. PlanningandOptimizationofFinalAssemblyProcessforAutomobiles(7/00–12/02),Supportedby985ProgramofTsinghuaUniversity.
    Cheng,Y.(PI),Zhao,B.(PhD),Wang,K.(Master),andLiang.N.(Undergraduate)
    Theobjectiveofthisprojectistoinvestigateonmethodsofassemblyprocessplanningforthelargenumberofassemblytasksinfinalassemblylineofautomobiles.
  8. VirtualPolishingofDieSurfaces,(7/00–12/02),Supportedby985ProgramofTsinghuaUniversity.
    Cheng,Y.(PI),Yu,Q.(Master),Hu,S.(Master),andYin,M.(Undergraduate)
    Theobjectiveoftheprojectistostudythemechanismofpolishingforfree-formsurfaces,andbuildsimulationmodelforthepolishingprocess,tooptimizetheprocessandpredictpolishingquality.
  9. InvestigationsonFEMVirtualCoordinateMeasuringMachineforDynamicErrorofFastProbing(1/00–12/01),SupportedbytheNationalScienceFoundationofChina
    Cheng,Y.(PI),Cai,F.,Ye,B.,Wang,C.,Hu,H.(Master),andYan,J.(Master)
    TheobjectivesofthisprojectaretostudytheapproachofvirtualcoordinatemeasuringmachineandbuildFEMsimulationmodelofthemachine,topredictandcompensatefast-probingerrors.

ResearchProjectsatDepartmentofPrecisionInstrumentsandMechanology,TsinghuaUniversity1.FabricationofFree-formSurface
  • VirtualLappingandPolishingforFree-formSurface,(1/00–6/01),SupportedbytheMinistryofEducation,China.
    Cheng,Y.(PI),Cai,F.,Li,Q.(PhD),andYu,Q.(Master)
    Theobjectiveofthisprojectistoinvestigateonmodelingandsimulationofthelappingand
    polishingprocess.
  • InvestigationsonFabricationMechanismandIntelligentAccuracyGenerationforHigh-AccuracyFree-formLens(1/97–12/98),SupportedbytheNationalScienceFoundationofChina.
    Cheng,Y.(PI),Cai,F.,Feng,Z.,Li,Q.(PhD),andFan,Y.(Master)
    Theobjectiveofthisprojectistoinvestigateonmechanismofmanufacturingprocessand
    approachestogenerateaccuracywithintelligentprocedures.
  • FabricationofFree-formLens(1/95–12/96),SupportedbytheCaihongGroup,China
    Feng,Z.(PI),Cheng,Y.(Co-PI),Li,Wang,J.,Zhao,G.,Li,Q.(PhD),Fan,Y.(Master),Zhu,C.
    (Undergraduate),Li,X.,andShi,Y.
    Theobjectiveofthisprojectistoinvestigateonprinciplesanddevelopasetoffacilitiesfor
    fabricationoffree-formlens.
2.ConcurrentEngineeringandReverseEngineering
  • DesignSystemofSetupsinConcurrentEngineeringEnvironment(1/99–12/00),SupportedbytheNational863High-TechProgramofChina.
    Cheng,Y.(PI),Cai,F.,Ye,B.,Li,M.(PhD),andHe,C.(Master)
    Theobjectiveofthisprojectistostudyonsystemstructureandsoftwaretoolstofacilitatedesign
    ofjigs,fixtures,andspecialtoolsformanufacturingofmissileparts.
  • ComputerAidedFixtureDesignforConcurrentEngineering(1/95–12/97),SupportedbytheNational863High-TechProgramofChina.
    Cheng,Y.(PI),Cai,F.,Ye,B.,Yang,D.(PhD),andTang,D.(Master)
    Theobjectivesofthisprojectaretoinvestigateonmethodology,algorithmsanddevelopa
    computeraidedfixturedesignsystemforconcurrentproductdevelopmentofmissiles.
  • ReverseEngineeringSystemforStructuralParts(10/96–9/97),supportedbytheNo.25FactoryofChineseAirForce.
    Cheng,Y.(PI),Cai,F.,Li,Q.(PhD),andTang,D.(Master)
    Theobjectivesofthisprojectaretostudytheapproachesofreverseengineering,andestablisha
    measuringandproductionsystemtocopysparepartsofdefensesystem.
  • InvestigationsonReal-TimeParallelCAD/CAPP(1/97–12/98),SupportedbytheNationalScienceFoundationofChina.
    Cai,F.(PI),Cheng,Y.(Co-PI),Ye,B.,Song,Y.(PhD),Xiao,Y.(Master),andKang,Y.(Master)
    Theobjectiveofthisprojectistoinvestigateonintegrationofproductdataandsupportingtoolstorealizereal-timeparallelproductdesignandmanufacturingprocessplanning.
  • IntelligentDesignforManufacturing(DFM)System(1/95–12/97),SupportedbytheNational863High-TechProgramofChina.
    Cai,F.(PI),Cheng,Y.(Co-PI),Ye,B.,Song,Y.(PhD),Xiao,Y.(Master),andKang,Y.(Master)
    Theobjectiveofthisprojectistoinvestigateonmethods,algorithmsandtoolstosupportDFM
    functionsinproductdevelopmentprocess.
3.ComputerIntegratedManufacturing
  • IntegrationofComputerAidedInspectionPlanning(CAIP)andCAD(7/92–6/94),SupportedbytheNational863High-TechProgramofChina.
    Cai,F.(PI),Cheng,Y.(Co-PI),Ye,B.,Lu,X.(Master),andHuang,L.(Master)
    Theobjectiveofthisprojectistoinvestigateoninformationintegrationbetweenproductdesigns
    andinspectionplanningwithSTEPstandard.
  • InspectionWorkstationinCIMSEnvironment(1/90–12/93),SupportedbytheNational863High-TechProgramofChina.
    Cai,F.(PI),Wang,X.,Cheng,Y.Wang,Q.,Cai,D.,Yu,J.(Master)
    Theobjectivesofthisprojectaretodesignthestructureoftheinspectionworkstation,andrealize
    automatedoperationofit.
4.QualityandMaintenance
  • Drop-outRateControlofSurfaceMountingDevices(7/96–6/97),supportedbyMotorola.
    Cheng,Y.(PI),Cai,F.,Wang,C.,andLi,Y.(Master)
    Theobjectivesofthisprojectaretoinvestigateonthereasonsthataffecttherateofdropped-out
    electroniccomponentsbythehigh-speedmountingmachines,andprovideonlinestatisticaltoolsto
    controlandpredicttheperformanceofthemachines.
  • IntelligentMachineMaintenanceTool(7/95–6/96),supportedbyMotorola.
    Cheng,Y.(PI),Cai,F.,Wang,C.,Yan,J.(PhD),andLi,Y.(Master)
    Theobjectiveofthisprojectistoinvestigateondiagnosismethodologytodetermineappropriate
    maintenanceactivities,tokeeptheelectronicassemblyfacilityworkingwithhighefficiency.
  • Knowledge-BasedIntegratedQualitySystemforManufacturingProcess(7/94–6/96),SupportedbytheNational863High-TechProgramofChina.
    Cai,F.(PI),Cheng,Y.(Co-PI),Wang,C.,Wan,J.(PhD),Pan,J.(Master),andLiang,M.(Master)
    Theobjectivesofthisprojectaretoinvestigateonreal-timeinformationintegrationbetweenonline
    qualityinspectionandoptimizationofmachiningprocess,withintelligentapproaches.



-----------------------------------------------------------------

JournalPapers
  1. Yin,M.,Cheng,Y.(2006).ResearchonPolishingwithCompositeRotationforDieSurface,ManufacturingTechnologyandMachineTool,accepted.(inChinese)
  2. Wang,S.,Cheng,Y.(2006).SimulationofDynamicSchedulingofLocomotivesforPassengerTransportation,RailwayTransportationandEconomics,accepted.(inChinese)
  3. Liang,N.,Cheng,Y.,andZhao,B.(2006).ResearchonFastandAutomatedProcessPlanningofAutomobileFinalAssembly,ComputerIntegratedManufacturingSystems,CIMS,accepted.(inChinese)
  4. Zhang,Z.,andCheng,Y.(2005).StudyontheDesignofRobotizedReconfigurableFixtureforAuto-BodyWelding,ManufacturingTechnology&MachineTool,2005(10),pp.101–104.(inChinese)
  5. Li,L.,Cheng,Y.,andYuan,S.H.(2005).MESBasedInformationSystemforManufacturingShopFloor,MachineryManufacturingEngineer,2005(4),pp.130–132.(inChinese)
  6. Li,L.,Cheng,Y.,andYuan,S.H.(2005).ResearchonPrioritySchedulingAlgorithmBasedonBottleneckAnalysis,ComputerIntegratedManufacturingSystems,CIMS,11(2),pp247–250.(inChinese)
  7. Zhao,B.,Cheng,Y.,Zhang,B.,andZhao.,H.(2004).EffectsofAutomobileFunctionalRestraintonFinalAssemblyProcessPlanning,MechanicalScienceandTechnology,23(5),pp.539–604.(inChinese)
  8. Li,L.,Cheng,Y.,andYuan,S.H.(2004).StudyontheApplicationofMES-BasedInformationSystemfortheTelecomCableProduction,ElectricWire&Cable,2004(4),pp.9–15.(inChinese)
  9. Hu,S.,andCheng,Y.(2004).RapidCNCPolishingforDieSurface,ManufacturingTechnology&MachineTool,2004(5),pp.44–46.(inChinese)
  10. Yan,J.,Cheng,Y.,andYe,B.(2003).DynamicErrorsofVirtual-CMMinFastProbing,ChinaMechanicalEngineering,14(13),pp.1136–1120.(inChinese)
  11. Zhao,B.,Cheng,Y.,andZhang,B.(2003).AutomobileFinalAssemblySequencePlanningBasedonthePartitionandLayerMethod,JournalofTsinghuaUniversity,43(11),pp.1452–1455.(inChinese)
  12. Yan,J.,Cheng,Y.,Ye,P.,andHu,H.(2003).AutomaticModelingTechnologyforVirtualCMM,ManufacturingTechnology&MachineTool,2003(8),pp.27–29.(inChinese)
  13. Goh,T.N.,Xie,M.,Cheng,Y.,andZhengL.(2003).ImprovingtheSixSigmaParadigm,IndustrialEngineeringandManagement,2003(5),pp.1–6.(inChinese)
  14. Zhao,B.,Cheng,Y.,Wang,K.,andZhang,B.(2003).DesignofSimulationSystemforAssemblyProcessPlanningofSedanProductionLine,JournalofSystemSimulation,15(2)pp198–201.(inChinese)
  15. Li,M.,Cheng,Y.,andZhao,B.(2002).CollaborativeApplicationPlatformforSmallandMedium-SizedEnterprise,ComputerIntegratedManufacturingSystems,CIMS,8(10),pp.762–765.(inChinese)
  16. Hu,H.,Cheng,Y.,Ye,P.,andWang,C.(2002).CalculatingandAnalyzingDynamicErrorofCoordinateMeasuringMachineforRapidDetection,ManufacturingTechnology&MachineTool,2002(9),pp.36–38.(inChinese)
  17. Yu,Q.,Cheng,Y.,andHu,S.(2002).ResearchonCNCLappingandPolishingTechnologyforDies&Molds'Profiles,ManufacturingTechnology&MachineTool,2002(8),pp.44–45.(inChinese)
  18. Zhao,B.,Cheng,Y.,andWang,K.(2002).ConstantTorqueWrenchWhichCanRecordFasteningInformation,ToolEngineering,36(7),pp.31–33.(inChinese)
  19. Jiao,H.,Xiang,H.,andCheng,Y.(2002).StudyontheSurfaceQualityMeasuringMethodforAutoPanelParts,AutomobileScienceandTechnology,2002(6),pp.37–40.(inChinese)
  20. Jiao,H.,Xiang,H.,Cheng,Y.,andWang,K.(2002).TheDevelopmentofPortableCarBodyContourMeasuringInstrument,MachineDesignandManufacturingEngineering,31(6),pp.106–110.(inChinese)
  21. Yan,X.,Ye,B.,Cheng,Y.,andXu,J.(2002).ResearchandDevelopmentofAReal-TimeTerminalDisplaySysteminAutomobileFinalAssemblyLine,MachineryDesign&Manufacture,2002(6),pp.32–34.(inChinese)
  22. Zhao,B.,Cheng,Y.,Wang,K.,Ren,F.,Ma,K.,andFang,J.(2002).DesignofAutomobileAssemblyQualityControlSystemwithWirelessRemoteControlTechnology,MachineDesignandManufacturingEngineering,31(5),pp.79–81.(inChinese)
  23. Yan,J.,Cheng,Y.,Ye,B.,Hu,H.,andZhao,B.(2002).AutomatedAnalyzinginVirtualCoordinateMeasuringMachine,MachineryDesign&Manufacture,2002(5),pp.41–42.(inChinese)
  24. Wang,K.,Cheng,Y.,Zhao,B.,Liang,N.,Zhao,H.,andWang,Y.(2002).ResearchonTaskPlanningSystemofAutomobileAssemblyProcessDesigning,MachineryDesign&Manufacture,2002(5),pp.21–22.(inChinese)
  25. Zhao,B.,Cheng,Y.,andWang,K.(2002).DesignofSignalCollectionandFeedbackApparatusforSuccessfulFasteningofTorqueWrench,MeasurementTechnique,2002(5),pp.10–11.(inChinese)
  26. Li,M.,Cheng,Y.,Zhang,B.,andCai,F.(2001).Web-BasedDistributedDesignMethodofFixtureScheme,ChinaMechanicalEngineering,12(9),pp.1011–1014.(inChinese)
  27. Li,M.,Cheng,Y.,Zhao,B.,andZhao,B.(2001).AgileFixtureDesignSystemforProductConcurrentDesign,ComputerIntegratedManufacturingSystems,CIMS,7(8),pp.44–48.(inChinese)
  28. Zhao,B.,Cheng,Y.,Ye,B.,Xing,G.,Ren,F.,Ma,K.,andFang,J.(2001).TheDesignandDevelopmentofReal-TimeQualityStatisticandControlSystemforAutomobileFinalAssemblyLine,MachineryDesign&Manufacture,2001(6),pp.26–27.(inChinese)
  29. Li,M.,Cheng,Y.,Zhang,B.,andCai,F.(2000).Web-BasedFixtureDesignEvaluationToolUnderConcurrentEngineering,ComputerIntegratedManufacturingSystems,CIMS,6(6),pp.70–74.(inChinese)
  30. Li,M.,Tang,D.,Cheng,Y.,andZhang,B.(2000).Web-basedCo-Decision-MakingApproachandApplicationforManufacturingProcess,JournalofTsinghuaUniversity,40(5),pp.16–19.(inChinese)
  31. Song,Y.,Cheng,Y.,Cai,F.,Xiao,Y.,andTang,D.(1999).StudyonKnowledge-BasedIntegratedDesignforManufactureofMechanicalParts,JournalofTsinghuaUniversity,39(8),pp.21–24.(inChinese)
  32. Li,Q.,Cheng,Y.,Cai,F.,Feng,Z.,andZhang,B.(1999).Dwell-TimeAlgorithminComputerControlledOpticalSurfacing,OpticalTechnique,1999(3),pp.56–62.(inChinese)
  33. Tang,D.,Li,Q.,Cheng,Y.,andCai,F.(1999).ResearchonFixtureDesignforFree-FormParts,ComputerIntegratedManufacturingSystems,CIMS,5(4),pp.61–65.(inChinese)
  34. Li,Q.,Cheng,Y.,Zhang,B.,andCai,F.(1999).StudyonProfileMeasuringinComputerControlledFabricationofOpticalFreeformSurface,OpticsandPrecisionEngineering,7(3),pp.89–96.(inChinese)
  35. Tang,D.,Cheng,Y.,Cai,F.,andLi,Q.(1999).AutomaticFixturePlanning,TsinghuaScienceandTechnology,4(2),pp.1443–1453.
  36. Tang,D.,Cheng,Y.,andCai,F.(1999).InvestigationsonFlexibleFixtureanditDesignMethod,ManufacturingTechnology&MachineTool,1999(2),pp.23–25.(inChinese)
  37. Tang,D.,Cheng,Y.,andCai,F.(1999).ResearchonConcurrentEngineeringOrientedComputer-AidedFixtureDesign,ComputerIntegratedManufacturingSystems,CIMS,5(1),pp.59–63.(inChinese)
  38. Li,Q.,Cheng,Zhang,B.,Feng,Z.,andCai,F.(1998).NCLappingTechniqueofOpticalFree-FormSurface,MechanicalProcessEngineer,1998(10),pp.6–8.(inChinese)
  39. Song,Y.,Xiao,Y.,Cheng,Y.,andCai,F.(1998).StudyofProductManufacturabilityandEvaluationMethods,JournalofTsinghuaUniversity,38(7),pp.111–114,119.(inChinese)
  40. Li,Q.,Cheng,Y.,Cai,F.,Zhang,B.,andFeng,Z.(1998).NCFabricationMethodofOpticalFree-FormSurface,OpticalTechnique,1998(6),pp.77–81.(inChinese)
  41. Yang,D.,Cheng,Y.,Cai,F.,Song,Y.,andXiao,Y.(1996).StudyonConcurrentFixtureDesign,ComputerIntegratedManufacturingSystems,CIMS,2(3),pp.31–35.(inChinese)
  42. Wang,X.,Cheng,Y.,andCai,F.(1996).InspectionWorkstationinCIMSystem,AutomationinMachineryIndustry,18(2),pp.1–5.(inChinese)
  43. Cheng,Y.,Cai,F.,andHuang,L.(1996).IntegrationofComputerAidedInspectionPlanningwithCADusingSTEP,TsinghuaScienceandTechnology,1(2),pp.167–171.
  44. Wang,X.,Cheng,Y.,andCai,F.(1994).IntegratedInspectionWorkstationinCIMSEnvironment,JournalofMachinery(Monthly),223,pp.138–143,(IntraditionalChinese,PublishedinTaiwan)
  45. Wang,X.,Duan,G.,Bai,Y.,andCheng,Y.(1993).ExperimentalResearchontheDynamicCharacteristicsofDiskProjectionBurnishingHead,JournalofTsinghuaUniversity,33(2),pp.1–6.(inChinese)

SelectedConferenceProceedings
  1. Zhao,B.,Cheng,Y.,Wang,K.,andZhang,B.(2002)ANewApproachforAssemblyProcessPlanningofAutomobileLarge-scaleProduction,ProceedingsofIE&EM’2002&IceCE’2002,Beijing,China,September19-21,2002
  2. Cheng,Y.,Li,Q.,Yu,Q.,Cai,F.,andZhang,B.,(2000).VirtualLappingforSculptured-Surface,Proceedingsofthe5thInternationalConferenceonProgressofMachiningTechnology,Beijing,China,September16-20,2000
  3. Cheng,Y.,Zhang,B.,Cai,F.,andLi,Q.(2000).Information-BasedManufacturingProcessofHighAccuracySculptured-Surface,ProceedingsofAMSMA’2000InternationalConference,Guangzhou,China,June19-21,2000
  4. Li,M.,Cheng,Y.,Zhang,B.,Cai,F.,andHe,C.(2000).Web-BasedFixtureDesignSystem,ProceedingsofAMSMA’2000InternationalConference,Guangzhou,China,June19-21,2000
  5. Li,Q.,Cheng,Y.,Tang,D.,andZhang,B.(1999).ComputerControlledFabricationofFree-FormGlassLens,ProceedingsofSPIE-TheInternationalSocietyforOpticalEngineering,v3782,Denver,USA,July20-23,1999
  6. Cheng,Y.,Wang,B.C.,Shinshi,T.,andShimokohbe,A.(1999).Virtual-CMMforFastProbingusingFEMApproach,ProceedingsofIMEKO-XVWorldCongress,VolumeIX(TC14),Osaka,Japan,June13-18,1999
  7. Cheng,Y.,Wang,B.C.,Shinshi,T.,andShimokohbe,A.(1998).VirtualCMMSoftwareforFastProbingwithConstantAcceleration,ProceedingsofAutumnConferenceofJapaneseSocietyofPrecisionEngineering,Sappolo,Hokkaido,Japan,September23-25,1998
  8. Cheng,Y.,Wang,B.C.,Shinshi,T.,andShimokohbe,A.(1998).VirtualCoordinateMeasuringMachineforEvaluationofPerformanceinFastProbing,Proceedingsof6thISMQCIMEKOSymposium,Vienna,Austria,September8-10,1998
  9. Li,M.,Tang,D.,Cheng,Y.,andCai,F.(1998).IntranetBasedMaintenanceDecisionSupportSystemforElectronicMountingDevices,Proceedingsof1998China-JapanBilateralSymposiumonAdvancedManufacturingEngineering,Huangshan,China,October5-10,1998
  10. Cheng,Y.,Li,Q.,Feng,Z.,andWang,J.(1996).PrecisionNCGrindingofFree-formGlassLens,ProceedingsofInternationalConferenceonPrecisionEngineering(ICPE’96)andthe6thSino-JapanSymposiumonUltra-precisionTechnology(6thSJSUT),Shenyang,China,September23-25,1996
  11. Cheng,Y.,andCai,F.(1995).AutomatedFixturingPlanningforInspectiononCoordinateMeasuringMachine,ProceedingsofInternationalConferenceonIntelligentManufacturing(SPIE),v2620,Wuhan,China,June14-17,1995
  12. Cheng,Y.,andCai,F.(1993).InspectionProcessPlanningforComplicatedParts,Proceedingsofthe6thInternationalManufacturingConferencewithChina(IMCC’93),HongKong,March10-12,1993
  13. Cheng,Y.,andCai,F.(1993).TouchingPointsDistribution&ProbePathPlanningforInspectioninCIMS,ProceedingsoftheInternationalConferenceonModernDesign,ManufacturingandMeasurement(MODMM'93),Beijing,China,May6-8,1993
  14. Cheng,Y.,andLu,X.(1993).InvestigationsonAutomatedInspectionPlanningandItsIntegrationwithCAD",ProceedingsoftheInternationalConferenceonComputerIntegratedManufacturing,Beijing,China,May12-14,1993
  15. Cai,F.,andCheng,Y.(1992).AutomatedInspectionPlanningandProgramminginCIMSEnvironment,ProceedingsofBeijingInternationalSymposiumonCIMS(ISCIMS’92),Beijing,China,June4-7,1992
  16. Cheng,Y.,andCai,F.(1991).ResearchonComputerAidedInspectionPlanninginComputerIntegratedManufacturingSystem,Proceedingsofthe11thInternationalConferenceonProductionResearch(ICPR),Hefei,China,August18-23,1991

Books
  1. Cheng,Y.(1998).QualityControlSysteminFlexibleManufacturingSystem.InZhang,P.(Ed.)FlexibleManufacturingSystem,PressofMachineryIndustry,China,1998(inChinese)
  2. Cheng,Y.(1997).AutomationSysteminMechanicalManufacturing.InHandbookofMechanicalEngineering(SecondEdition),PressofMachineryIndustry,China,1997(inChinese)
  3. Cheng,Y.(1996).ComputerIntegratedManufacturingSystem,InYang,Z.(Ed.)IntegratedMechanical-ElectronicSystem,PressofScienceandTechnologyLiterature,China,1996(inChinese)



-----------------------------------------------------------------

ProfessionalAffiliationsandActivities1.Conference
  • OrganizationCommittee,SessionChairman,5thInternationalConferenceonProgressofMachiningTechnology(ICPMT2000),Beijing,China,September16-20,2000
2.AcademicOrganization
  • Seniormember,ChineseMechanicalEngineeringSociety
  • Generalsecretary,CommitteeofProductionSystem,ChineseMechanicalEngineeringSociety


相关话题/导师 工业工程